Commit f92756

2026-09-08 20:59:09 Anonymous: Record Story30 closure and Cast31 submission/review; forecast F1.12
hold the flood/design plan.md ..
@@ 1,7 1,5 @@
# Hold The Horde — Design Plan
- **Latest handoff — 8 September, 20:37 Jerusalem:** Story30 has completed its one focused review. Systems is working on consolidated response464; receiving20:36:45.498 verified. The correction specifies historical evidence and what remains observable before/after core isolation. Reviewer stopped. Counts remain30 tracked/28 preparation-closed/2 open, coverage11 usable/4 partial; reviewed delivery22:15(21:30–23:00) and wiki22Sep(18–29) unchanged. The dated details below retain the submitted463 snapshot until this response is dispositioned.
-
Design a discovery-first survivorlike under the [Owner Brief](/Hold%20The%20Flood/Brief), with expressive builds, meaningful hordes and an authored colony. Written comparisons establish proposals and dependencies; they do not demonstrate fun, balance, accessibility, production feasibility or campaign duration. This phase remains design only.
## Current owner direction
@@ 12,19 10,23 @@
## Active outcomes
- See the dated [Progress board](/Hold%20The%20Flood/Progress): **30 design packages,28 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+ See the dated [Progress board](/Hold%20The%20Flood/Progress): **31 design packages,29 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
| Design Lead | Player Information18 preparation closed387 | Claude paused by owner; no wakeup until owner confirms |
- | Systems | [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map); sole author under461 | Draft463 submitted20:30:02 at e902a631; Systems STOPPED after four proposed mystery/personal chains. Draft21:15 target achieved early; reviewed22:15(21:30–23:00) remains the medium-low-confidence forecast, today8Sep Jerusalem. Language29 closed459 at20:23:52, finaldf0f48f5; Systems retains STOPPED ownership. |
- | Independent Reviewer | Permanent Claude role paused | Language29 one critique/response complete and closed459. Story30 criteriab1a66b77 were saved before assignment/new draft, root-read and registered460; temporary reviewer is undertaking the one focused review of actual463 sourcee902a631 under462 after author STOP. One critique/response precedes PM disposition; the draft is not accepted. |
- | PM | Remaining integration04, Story30 review, intake and forecasts | Parent-equipment432, legacy Discovery/Expedition441–443 and Coming Home/Home Projects456 compatibility complete; PM retains STOPPED ownership of the two home parents. Global04 and all three owner questions remain open. Eleven usable first-pass contracts/four partial areas; core11Sep/wiki22Sep unchanged. |
+ | Systems | [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map); sole author under468 | Draft470 submitted20:53:50 atadb7b4a4; Systems STOPPED. Five cast briefs/fifteen unique scenes, three primary per person. Draft21:30 target achieved early; reviewed22:30(22:00–23:30) remains the medium-low-confidence forecast, today8Sep Jerusalem. Story30 closed466 at20:42:22, final03c9cb8e; Systems retains STOPPED ownership. |
+ | Independent Reviewer | Permanent Claude role paused | Story30 one critique/response complete and closed466. Cast31 criteriae87d7950 registered467 before assignment; the one pre-authorized review of actual470 sourceadb7b4a4 proceeds under469 after explicit author STOP. Submission is not accepted; PM retains the consolidated response and disposition. |
+ | PM | Remaining integration04, Cast31 review, intake and forecasts | Parent-equipment432, legacy Discovery/Expedition441–443 and Coming Home/Home Projects456 compatibility complete; PM retains STOPPED ownership of the two home parents. Global04 and all four owner questions remain open. Twelve usable first-pass contracts/three partial areas; core11Sep/wiki22Sep unchanged. |
PM's narrow parent-equipment alignment432 and legacy Discovery Chain/Expedition integration441–443 are complete. The latter preserves historical post-death routes and world-time capture with full frozen journal inspection; it grants no new access guarantee. Global04 and death/rescue ordering remain unresolved. Do not treat a former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
## Ready for reaction
+ [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) preparation closed466 at20:42:22 Jerusalem, final03c9cb8ee95564f08cf59b065f97c0a008981a489f8a8b223df0048d4cfb6de9. One focused critique/response separated present diagnostic evidence from limited historical chronology, specified isolation's retained/lost evidence and used shared mechanical cycle impressions. Four mystery/personal chains, apparent/deeper/optional-secret layers and five proposed human scene variants form a usable first-pass contract. Captive/empty-core, treatment, reversibility and departure remain proposals; actual placement, full cast/15scene allocation and exhaustive variants remain unfinished.
+
+ **New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. Together with final station-layout behavior, first survivor and equipment acquisition, this makes four pending owner questions.
+
[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation closed459 at20:23:52 Jerusalem, finaldf0f48f5bd39659105ca5e3b31e7341e4d0a8b36618a7eaed8f60d7120038a0a. One focused critique/response restored distinct address/body evidence, kept valid captures usable across lives and specified the iris's local B input and visible completion state. Four operational chains and the two-language/two-register classification are prepared proposals; actual clue/string/room variants, final origins/story and comprehension evidence remain unfinished. One local plate/input/state variant fits the existing iris mechanism; no extra region/objective/module/mechanism slot.
[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation closed450 at20:01:12 Jerusalem, final5bff34369c17fcbdb4bb948373c9e2a255d0ab1887a5308b96e9d1fb6adc95b6. One focused review/response clarified commissioning, first-return actions and participant/facility availability. Living/death return, deliberate storage/sharing, refill, optional work and loan/reclaim form a usable first-pass contract. Five project briefs remain two reused/three new with three proposed fixed ship fixtures; five final cast arcs/15scenes, exact fixture/control presentation, owner choices and gameplay validation remain unfinished.