2026-09-08 18:26:49
Anonymous:
Record the verified regional author response handoff
hold the flood/progress.md ..
@@ 1,12 1,12 @@
# Hold The Horde — Progress
-
**Updated 2026-09-08 18:22 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
+
**Updated 2026-09-08 18:26 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
-
**25 tracked design packages: 23 preparation-closed, 2 open.** Save And Content State23 closed417 at18:09:56 Jerusalem. Production Scope24 then closed423 at18:21. Regional Discovery Map25, assigned418, is reviewing draft420; shared integration04 remains dependent. The separate management coverage map and two unadopted intake contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
+
**25 tracked design packages: 23 preparation-closed, 2 open.** Save And Content State23 closed417 at18:09:56 Jerusalem. Production Scope24 then closed423 at18:21. Regional Discovery Map25, assigned418, is in author response424 after review of draft420; shared integration04 remains dependent. The separate management coverage map and two unadopted intake contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
-
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Production24 is preparation-closed423; Regional25 draft420 is in focused independent review. Systems retains stopped ownership while PM handles the review, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
+
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Production24 is preparation-closed423; Regional25's focused review is complete and Systems is revising under424. PM will verify its final response while handling intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
## Forward forecast — baseline F1
@@ 82,7 82,7 @@
## What changed in this report
- [Save And Content State23](/Hold%20The%20Flood/Save%20And%20Content%20State) preparation-closed417 at18:09:56, final438cdf35. The returning manifest includes active rig and inactive cargo once; delivery requires the same person aboard and the closed airlock; saved evidence retains provenance without refreshed truth. Save policy and unresolved rescue/shift behavior remain proposals.
-
- New [Production Scope24](/Hold%20The%20Flood/Production%20Scope) gives PM the finite scope/reuse/cost comparison. New [Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map) gives Systems four proposed regions and twelve linked objectives. Production24 closed423 at18:21 after its one review/response; Regional25 draft420 at18:16 is under independent review, then one response and PM disposition.
+
- New [Production Scope24](/Hold%20The%20Flood/Production%20Scope) gives PM the finite scope/reuse/cost comparison. New [Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map) gives Systems four proposed regions and twelve linked objectives. Production24 closed423 at18:21 after its one review/response; Regional25 draft420 at18:16 received one independent review; Systems is responding under424, then PM verifies the final source.
- The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now distinguishes seven first-pass contracts and eight partial areas. The regional map remains partial; no overall percentage is implied.
- Intake407 remains open: Rescue Shift Proposal and Station Assembly Example are unadopted, with contributor/ownership context and consequential choices pending. Neither answers the existing owner questions or closes04.
- Production review exposed missing explicit room/mechanism authoring. The revised144–247role-hourv1 allowance includes24module/40room/12mechanism brief minimums and unique review/response/integration. It is a planning estimate, not recorded effort. Both Claude roles remain paused; dates stay provisional pending9Sep capacity review.
@@ 117,7 117,7 @@
|22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized|
|23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open|
|24|[Production scope](/Hold%20The%20Flood/Production%20Scope)|Closed|Reviewed provisional finite scope and work accounting|Sep8 18:21 disposition423|Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected|