Commit d7bacb

2026-09-06 20:19:51 Anonymous: EQP101 submitted for PM review: twelve-item catalogue, three branched build families, exact saved revisions and COL-I2 response; staffing evidence without self-acceptance
hold the flood/tasks.md ..
@@ 38,6 38,33 @@
| REV104 | Existing Independent Design Critic | Blocked — expanded integrated submission not yet available | Review DES104's actual revision for owner fit, consistency, distinct content, meaningful growth, mystery coherence and asset burden. Critique available substantive sections as they arrive; no claimed future acceptance |
| OWN102 | Owner | Blocked — compelling expanded proposal still required | Owner assessment of the larger design, followed by separate explicit development authorization if desired; design-only gate remains active |
+ ### EQP101 — submitted equipment and build design
+
+ **2026-09-06 UTC · Equipment and Build Designer · In review; PM acceptance pending.** The owner assigned EQP101 to this role in the current session. This first substantive submission is staffing evidence; the earlier “Blocked — role not yet created” entry above predates it. No other role is claimed to have read or acted on this submission, and no task is self-accepted.
+
+ **Deliverable:** [Equipment](/Hold%20The%20Flood/Equipment#eqp101-submission) recommends twelve catalogue entries (three primaries, nine modules), retains Cutter and all seven earlier modules, and supplies three families—Circuit Harvester, Route Shepherd and Salvage Breacher—with early/middle/late choices, real branches, acquisition, exploration interactions, enemy countercases and costs. Dedicated item pages specify trigger/effect/target, space/resource costs, restrictions and combinations. [Build Paths](/Hold%20The%20Flood/Equipment/Build%20Paths) includes legal rack layouts and the focused COL-I2 response.
+
+ **Proposed changes, not adopted rules:** fixed eight-cell rack instead of six-to-nine progression; player-selected charge priority instead of most-room; explicit leakage and field-handling rules; Cutter-only Arc, completed nonlethal Prod, Rivet Driver, bounded Cable Reel and Hand Pump. Tide Glass is explicitly deferred with a reason. [Inventory and Charge](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge) is the prepared transfer destination, with E1–E8 and the source-to-destination request. Lead's author-adopted Power and Attraction remains the shared-rule authority until Lead integrates any changes.
+
+ **Current-source reconciliation:** derived from Design Document ec1b6c, then read r15 5f9fbb, shared contract 69024c, Campaign 34dc09 and COL101 a1046d published during drafting. Exact revision-linked source register is on Equipment. Took up Colony's inspection/reissue proposal, one advanced support assembly and its offered revisit-only full-rack limitation; proposed six issued equipment cells including banks/brace, which leaves two cargo cells if eight are adopted. First-visit tooling packages and costs remain cross-role proposals. No claim of a Colony response to EQP101.
+
+ **Verified saved artifacts:** each page was fetched immediately before save, all pre-existing author lines preserved, final metadata trailer removed, saved with descriptive commit text, then fetched again to confirm intended Markdown. These revisions identify the actual submission:
+
+ | Artifact | Saved revision |
+ | --- | --- |
+ | [Hold The Flood/Equipment](/Hold%20The%20Flood/Equipment?revision=a44990) | a44990 |
+ | [Hold The Flood/Mechanics/Inventory And Charge](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=73eb77) | 73eb77 |
+ | [Hold The Flood/Equipment/Utility Modules](/Hold%20The%20Flood/Equipment/Utility%20Modules?revision=087718) | 087718 |
+ | [Hold The Flood/Equipment/Coil](/Hold%20The%20Flood/Equipment/Coil?revision=a7d2d5) | a7d2d5 |
+ | [Hold The Flood/Equipment/Arc](/Hold%20The%20Flood/Equipment/Arc?revision=9b7b1d) | 9b7b1d |
+ | [Hold The Flood/Weapons/Alternative Tools](/Hold%20The%20Flood/Weapons/Alternative%20Tools?revision=e6aed6) | e6aed6 |
+ | [Hold The Flood/Equipment/Build Paths](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=a9a288) | a9a288 |
+ | [Hold The Flood/Weapons/Cutter](/Hold%20The%20Flood/Weapons/Cutter?revision=9618ad) | 9618ad |
+
+ **Remaining interfaces:** Lead dispositions rack/collection/resource changes and performs author-approved transfer; Combat dispositions targeting, finite chaining, Prod displacement and partial-group yield; Colony dispositions tooling eligibility, revisit boundary and capital prices; Campaign places first finds and meaningful route alternatives; World checks cable/drain topology against essential clue access and power/signal rules. No rule-level acceptance is inferred from the submission. No new code, assets, prototypes, simulations, playtests or duration claims.
+
+ **PM request:** review EQP101, record staffing from these artifacts and accept or assign one bounded revision. The submission is reviewable without an owner relay or a new owner permission question. Task acceptance remains PM's; design approval and development authorization remain the owner's.
+
**Review priority:** move from repeatedly polishing the same short district to developing the missing game. Existing PMR003/REV103 defects still need actual corrections; no automatic closures and no micro-ledger review loop should block parallel campaign drafting. Reader and External Critic should assess the next substantive campaign proposal, using their existing mandates. Researcher may support specific design/asset questions; no extra market-length survey is requested.
**Staffing:** the four new roles are proposals with ready prompts, not active agents. Existing Lead owns interim domain decisions and can start DES104 immediately. No owner relay or assumption that a posted task wakes another chat.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9