2026-09-09 12:45:36 Anonymous: PM563 final coherence38: align accepted contracts and date completed preparation
hold the flood/production scope.md ..
@@ 75,15 75,17 @@
The earlier **14–24 role-hour** scope37 allowance is retained as a dated 9 September full-cycle estimate for initial authoring, one critique, one response and PM disposition. Initial authoring and critique are now complete; they are not charged again as forward work.
- | Finite work remaining at this response | Unique work still required | Judgment allowance |
+ **Dated response snapshot, 9 September:** the following allowance was recorded before scope/handoff37 closed. That response and disposition are now complete; the forward remainder at the start of readiness38 is the **10–18 role-hour coherence allowance**. These are scope judgments, not logged labor or a measured rate.
+
+ | Finite work remaining at that response | Unique work then required | Judgment allowance |
|---|---|---:|
| Scope/handoff37 response and disposition | This one consolidated response, exact source/diff/readback verification and PM acceptance/integration. | **4–8 role-hours** |
| Whole-v1 coherence and bounded repair disposition | Check current links/revisions, stale present-tense claims, owner/proposal labels, interface ownership and cross-article contradictions after 514/528/545; make only evidenced bounded repairs and final M3 disposition. No closed-domain review is repeated. | **10–18** |
- | **Current finite M3 remainder** | Campaign36 is removed because it closed545; accepted initial37 authoring/review is removed; overlap is not charged again. | **14–26 role-hours** |
+ | **Finite M3 remainder at that response** | Campaign36 is removed because it closed545; accepted initial37 authoring/review is removed; overlap is not charged again. | **14–26 role-hours** |
This is a forward workload allowance, not a timesheet, a subtraction from chat turnaround or an observed throughput rate. After this response is delivered, the remaining37 share is principally PM verification/disposition within the 4–8 row; the range is not retrospectively reduced by guessing how much productive labor already occurred. Any concrete Coverage residue found by the coherence pass stays inside its 10–18-hour bounded-repair allowance unless the pass demonstrates genuinely new scope.
- The PM's adopted **F1.14** calendar remains the current management forecast: M2 coherent core **11 September (10–14 September)**; complete first-pass M3 wiki **14 September (11–18 September), low confidence**; M4 detailed campaign **10 November (20 October–1 December), low confidence**. This scope analysis does not silently replace those dates. The 14–26-hour remainder is compatible with the M3 range only if the coherence pass finds bounded corrections and PM capacity remains available. A new technical/production specialist on 10 September is conditional on a concrete independent gap and is not counted as available capacity. No extra permanent role or two guaranteed specialists are assumed.
+ The PM's adopted **F1.14** calendar remains the current management forecast: M2 coherent core **11 September (10–14 September)**; complete first-pass M3 wiki **14 September (11–18 September), low confidence**; M4 detailed campaign **10 November (20 October–1 December), low confidence**. This scope analysis does not silently replace those dates. That response-time 14–26-hour allowance, now narrowed to 10–18 for coherence after the scope/handoff closure, is compatible with the M3 range only if the coherence pass finds bounded corrections and PM capacity remains available. A new technical/production specialist on 10 September is conditional on a concrete independent gap and is not counted as available capacity. No extra permanent role or two guaranteed specialists are assumed.
## M4 detailed-campaign boundary and allowance
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9