Commit c28ef3

2026-09-15 14:45:54 Anonymous: Record scope draft and independent review F2.13
hold the flood/design plan.md ..
@@ 30,7 30,7 @@
## Working now: campaign scope
- Systems is preparing a costed campaign comparison. It will identify the experiences retained, moved or lost in a concentrated alternative to the current inventory, preserving hordes, expressive builds, both languages and the whole remaining station puzzle. Estimates will separate document authoring from later production and expose their assumptions. No smaller scope is selected.
+ [Campaign Scope Choices](/Hold%20The%20Flood/Campaign%20Scope%20Choices) was submitted at 14:38 and is in independent review. It compares 40 rooms with a denser 36-room alternative, naming the discoveries and recovery spaces that move. Systems is stopped for review. The cost allowance needs careful qualification because it predates the added scan mechanism; no smaller scope or revised estimate is selected.
One focused critique and one response belong to each bounded outcome. The outside-edit preservation audit is complete and its factual follow-ups are published; broader readability and design readiness remain open. States and estimates are on [Progress](/Hold%20The%20Flood/Progress).
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9