Commit c26969

2026-09-15 14:55:14 Anonymous: Align current mechanism counts and historical scope allowance; preserve unselected scope
hold the flood/campaign scope choices.md ..
@@ 10,7 10,7 @@
The player comes home with a component, dated observation or rescued person that changes a later loadout, conversation or route. Deepest completion turns forty remembered places into one continuous walk back to the ship. The exact graph and ultimate consequence remain open.
- In the **36-room concentration**, the same scan, horde/build climax and findings survive, but the spatial pauses shrink. The coupler moves into the busy Pace Calibration Bay. A protected recess keeps the Regulator Gallery’s causal reply evidence, but no second room changes the first room’s meaning. Fixed and reversible transformations share the Synchronization Gallery. The first core clamp moves onto the Selector Hall wall; the second keeps the West recovery walk, but the refuge between them disappears. Completion must make all thirty-six places continuous, although no valid full layout has been demonstrated. The saving is fewer layouts and connections; the risk is visual competition and a tighter discovery rhythm.
+ In the **36-room concentration**, the same scan, horde/build climax and findings survive, but the spatial pauses shrink. The coupler moves into the busy Pace Calibration Bay. A protected recess keeps the Regulator Gallery’s causal reply evidence, but no second room changes the first room’s meaning. Fixed and reversible transformations share the Synchronization Gallery. The first core clamp moves onto the Pressure-Receiver Vault wall; the second keeps the West recovery walk, but the refuge between them disappears. Completion must make all thirty-six places continuous, although no valid full layout has been demonstrated. The saving is fewer layouts and connections; the risk is visual competition and a tighter discovery rhythm.
| Scope unit or player consequence | 40-room reference | 36-room concentration | Honest production meaning |
|---|---|---|---|
@@ 19,7 19,7 @@
| People; primary scenes; home projects | 5; 15; 5 | 5; 15; 5 | No cast, rescue, dialogue-state or home-project cut. |
| Equipment definitions | 12 | 12 | No reduction in connected-build rules, acquisition or compatibility work. |
| Encounters; setpieces; enemy roles | 10; 2; 6 ordinary + 3 special | Same | Meaningful hordes and both climaxes remain; no population, source or staging work is silently removed. |
- | Mechanism families; major placed mechanisms | 5; **14 proposed** | Same | P14 Moving Scan remains in R15 with its R28 receiver. Current Production Scope and Whole Game Outline still say 13; that is reference lag, not a cut. |
+ | Mechanism families; major placed mechanisms | 5; **14 proposed** | Same | P14 Moving Scan remains in R15 with its R28 receiver. The moving scan adds rail, bay, bridge and receiver work within the existing rooms. |
| Languages; investigation chains; evidence index | 2; 4 language + 4 story; 26 entries | Same | All comparisons, corrections and consequences remain; rehosting does not erase their writing or state cost. |
| Deepest joining payoff | Required: a valid all-40 network; not demonstrated | Required: a valid all-36 network; not demonstrated | A smaller physical achievement and graph, but still the entire chosen station. Neither option selects what completion does or an ending. |
| Further detailed-campaign documentation | Historical SMALL allowance: 350–590 role-hours, based on 13 major mechanisms | No defensible adjusted total yet | P14 and revised scan/horde geometry have no measured estimate. The old range is a provisional reference, not confirmed coverage, current remaining hours or a ceiling. |
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9