Commit bb2934

2026-09-10 13:01:38 Anonymous: Record actual designer activity and completed independent review criteria
hold the flood/progress.md ..
@@ 25,9 25,9 @@
| 50 — Rooms and return routes | Design Lead / PM | Closed at 12:51 after author response and verification | Complete as a written proposal |
| 51 — Room and information review | Reviewer | Submitted 12:31; closed after PM checked its findings | Complete; no repeat review |
| 52 — Player information and supporting rules | Systems / PM | Closed at 12:51 after author response and verification | Complete as a written proposal |
- | 53 — Three builds at horde scale | Systems | Assigned: actual coverage, power, heat and controls for the three climaxes | Draft 14:00, range 13:30–14:30 |
- | 54 — Three worthwhile expeditions | Design Lead | Assigned: compare two approaches to repeated living returns and recommend one | Draft 13:45, range 13:15–14:15 |
- | 55 — Build and expedition review | Reviewer | Assigned: independent criteria, then one combined review | Review 14:45, range 14:00–15:15 |
+ | 53 — Three builds at horde scale | Systems | Working; initial judgment saved before the optional candidate | Draft 14:00, range 13:30–14:30 |
+ | 54 — Three worthwhile expeditions | Design Lead | Working; initial judgment saved and assignment acknowledged | Draft 13:45, range 13:15–14:15 |
+ | 55 — Build and expedition review | Reviewer | Criteria saved and read by PM; stopped until a draft is ready | Review 14:45, range 14:00–15:15 |
| 38 — Full design readiness | PM | Reopened after owner feedback | First-pass wiki 15 September |
| 39–40 — Earlier detailed samples | Systems / Design Lead | Parked and unaccepted | Reassess after correction |
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9