PM progress through521: three morning closeouts; verified parallel35/36 work and unchanged F1.14 targets
hold the flood/design plan.md ..
@@ 10,24 10,26 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **34 design packages,32 preparation-closed and2 open (04,34)**. Status is through submissions 498–499. PM reports every15 minutes during authorized active work. The adopted M3 first-pass target is14 September (11–18), low confidence; M2 remains11 September (10–14), M4 remains10 November (20 October–1 December). See Progress for assumptions and preserved forecast history.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **36 design packages,34 preparation-closed and2 open (35,36)**. Status is through521; coverage was explicitly classified519. PM519 classifies15 usable first-pass domains/0 partial after global04 and parent verification; this is not M3 completion. PM reports every15 minutes during authorized active work. The adopted M3 first-pass target is14 September (11–18), low confidence; M2 remains11 September (10–14), M4 remains10 November (20 October–1 December). See Progress for assumptions and preserved forecast history.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
-
| Design Lead | [Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options); sole new-article owner491 | Original Claude resumed490; submitted499 at10:42:21, source134f2e9f; STOPPED. Draft today12:00 (11:15–12:45), reviewed13:00 (12–14); actual receiving and submitted source verified. |
-
| Systems | [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity), assigned494 within existing04 |33 closed493 at5c1a9ad6; stopped ownership retained.494 received; submitted498 at10:41:54, sourceb20454c5; STOPPED. Draft12:00 (11:15–12:45), reviewed candidate13:00 (12–14), then explicit parent alignment before04 closure. |
-
| Independent Reviewer | Original role resumed; two ONE reviews preauthorized495 | Handoff495 delivered. Criteria497 saved before new drafts; earlier485/contract exposure honestly disclosed. Both submitted sources read; one focused critique each underway. No acceptance claimed. |
-
| PM |34 tracked /32 preparation-closed /2 open (04,34);14 usable /1 partial | Coordinate verified handoffs, five unanswered owner questions, finite mechanical/reference interfaces, scope/handoff and final coherence. M3 now adopted14Sep (11–18), low confidence; M2 remains11Sep and M4 remains10Nov. |
+
| Design Lead | [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk), assigned519; owns only new36 article | WORKING after verified receiving/source reads11:09–11:10; one courierd244533e. Draft12:30 (12–13:30), reviewed14:00 (13–15:30). Eleven global04 parents and Information34 STOPPED after accepted alignment518. |
+
| Systems | [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities), one response521 after critique520 | WORKING; public receiving11:11:46 verified after one native send. Response12:00 (11:30–12:30), reviewed preparation13:00 (12:15–14:00). Submitted515 revisiona2d3c5e4 is not accepted. Continuity article577236e7 remains STOPPED. |
+
| Independent Reviewer | One35 focused critique520 complete under517 and independent505/507 criteria | STOPPED after520; Systems is working on the one consolidated response521. No second04/34 reviews pending. |
+
| PM |36 tracked /34 preparation-closed /2 open (35,36);15 usable /0 partial | Coordinate35 response,36 work, five unanswered owner questions, remaining actual-ID interfaces, scope/handoff and final coherence. M3 remains14Sep (11–18), low confidence; M2 remains11Sep and M4 remains10Nov. |
-
PM's narrow parent-equipment alignment432 and legacy Discovery Chain/Expedition integration441–443 are complete. The latter preserves historical post-death routes and world-time capture with full frozen journal inspection; it grants no new access guarantee. Global04 and death/rescue ordering remain unresolved. Do not treat a former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
+
PM's narrow parent-equipment alignment432 and legacy Discovery Chain/Expedition integration441–443 are complete. The latter preserves historical post-death routes and world-time capture with full frozen journal inspection; it grants no new access guarantee. Global04 preparation closed518 at11:07:24 after accepted577236e7 and all eleven parent alignments were independently verified. Owner-dependent branches remain unselected. Do not treat a former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
-
**Remaining M3 scope and staffing:** use the [Coverage finish map](/Hold%20The%20Flood/Design%20Coverage):04 continuity/parent alignment,34 main information/options, representative mechanical/quantity and actual-ID reference checks, finite scope/handoff and one coherence disposition. Full scripts and exhaustive variants belong to M4. **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. No extra agent creation is required today; a10Sep technical/production candidate is useful only for a concrete independent handoff gap. Next ordinary forecast review9Sep18:00. Earlier Sep22/Sep25 scenarios remain historical; yesterday’s F1.14 draft was unpublished.
+
**Remaining M3 scope and staffing:** use the [Coverage finish map](/Hold%20The%20Flood/Design%20Coverage):35 representative mechanical/quantity rules,36 evidence/state crosswalk, remaining actual-ID reference checks using prepared34 and closed04, finite scope/handoff and one coherence disposition. Full scripts and exhaustive variants belong to M4. **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. No extra agent creation is required today; a10Sep technical/production candidate is useful only for a concrete independent handoff gap. Next ordinary forecast review9Sep18:00. Earlier Sep22/Sep25 scenarios remain historical; yesterday’s F1.14 draft was unpublished.
**New rescue question now with the owner (485):** if the astronaut dies during an eligible short rescue, use a protected retreat that leaves the survivor alive and unsent in the prepared refuge before one shift, with spent supplies still spent and a new short route to find; or allow danger and prepare concrete injury/loss options for a later choice. The proposed protection is new and unselected. No answer is inferred; the earlier four questions remain pending, making five.
## Ready for reaction
-
[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation closed493 on9 September10:32:09, final `5c1a9ad663ead360b3b80a66caca4e724d91dac38d50979d70f1d460bd0c23d2` (57,934 bytes), after one critique/response and narrow PM integration492. Ten encounters INCLUDE two setpieces; thirteen major mechanism briefs are prepared. Later E03 population enters only at a later death-shift boundary, and reset faces preserve self-contained hosts. Systems retains stopped ownership. Room32 closed481 with24 modules/40 rooms; compact relationships and ordinary service-interface obligations remain explicit. No owner-selected game size, full arrangement proof or gameplay validation is claimed.
+
[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) closed509 at10:53:59 Jerusalem, final61e0be4a (30,692 bytes), after one critique/response plus PM508 integration. Its41 main states/9 bands,5 journal sections,4 manifest sections,10 options and4 walkthroughs are prepared proposals. The [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate was accepted512 at10:56:53, final577236e7 (41,870 bytes), after one critique/response. Global04 closed518 at11:07:24 after all eleven aligned parents were independently verified; Lead retains STOPPED ownership of: Save And Content State; Connecting The Station; Rescue Rules; First Survivor; Cast And Short Rescue Map; Station Room And Module Inventory; Encounter And Mechanism Placement Inventory; First Expedition Options; Player Information; Death And Persistence; Shifting Station Options. Protected retreat and the full-station payoff remain unselected owner branches. New36 is separately assigned519; no further parent edits are authorized by that assignment.
+
+
[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation closed493 on9 September10:32:09, final `5c1a9ad663ead360b3b80a66caca4e724d91dac38d50979d70f1d460bd0c23d2` (57,934 bytes), after one critique/response and narrow PM integration492. Ten encounters INCLUDE two setpieces; thirteen major mechanism briefs are prepared. Later E03 population enters only at a later death-shift boundary, and reset faces preserve self-contained hosts. Systems retained stopped ownership at493; Lead now retains STOPPED ownership after33 compatibility alignment was verified518. Room32 closed481 with24 modules/40 rooms; compact relationships and ordinary service-interface obligations remain explicit. No owner-selected game size, full arrangement proof or gameplay validation is claimed.
[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation closed473 at21:12:44 Jerusalem, final6456406b101845e6c9a6563a69fc7f56c1dcc7bf8227445bf14a03fa072f5514. Five proposed people have fifteen uniquely identified first-pass scenes, three primary per person. One focused critique/response corrected the initial current walked rescue route, actual movement event and first ship-bench operation. D2 inherits Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. Final cast, first survivor, mortality and owner choices remain unselected; full scripts, state/geometry variants and placements remain unfinished.
@@ 55,7 57,7 @@
[Survival and Loadout](/Hold%20The%20Flood/Survival%20And%20Loadout) preparation closed392. It proposes resource/capacity lifecycle rules and opening packing choices, including retained prepared oxygen. Exact quantities and balance remain unselected.
-
[Player Information](/Hold%20The%20Flood/Player%20Information) preparation closed387 after one review/response. It separates observed, recorded and reported information, preserves the full journal pause and short rescue limits, and sets a proposed accessibility baseline. Its full cue inventory is later work; no usability is claimed.
+
[Player Information](/Hold%20The%20Flood/Player%20Information) preparation closed387 after one review/response. It separates observed, recorded and reported information, preserves the full journal pause and short rescue limits, and sets a proposed accessibility baseline. Its main cue/action inventory is now prepared in34, closed509; full presentation variants remain later work. Lead retains STOPPED ownership of this older parent after verified alignment518; no usability is claimed.
[Whole Game Outline](/Hold%20The%20Flood/Whole%20Game%20Outline) is preparation-closed378 after draft369, focused review370 and response374. It connects the opening to middle, ending and secret layers, including a later expedition and finite content bands. It is a planning scaffold: story/ending choices, quantities and complete estimate coverage remain open.
@@ 81,7 83,7 @@
- [Exploration Structure](/Hold%20The%20Flood/Exploration%20Structure) and [Death and Persistence](/Hold%20The%20Flood/Death%20And%20Persistence): safe carried-property return and retained work remain; the old fixed geometry requires replacement with the new shift direction.
- [Oxygen and Observation](/Hold%20The%20Flood/Oxygen%20and%20Observation), [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain) and [Clues and Help](/Hold%20The%20Flood/Clues%20and%20Help): readable survival state, captured evidence, voluntary investigation and truthful bounded survivor help. Prior geographic observations cannot guarantee current routes after a shift.
- [Horde Encounters](/Hold%20The%20Flood/Horde%20Encounters) and [Combat Rules](/Hold%20The%20Flood/Combat%20Rules): route crowds and selected contested work, with persistent completed stages and strong builds allowed to succeed. Targeting and individual creature behaviour remain proposals.
-
- [Rescue and Home](/Hold%20The%20Flood/Rescue%20and%20Home) and [Rescue Rules](/Hold%20The%20Flood/Rescue%20Rules): a short cooperative crossing remains useful. Finite multi-stage routes need to meet the owner's short-rescue condition, and death/shift/abort ordering still needs a coherent contract.
+
- [Rescue and Home](/Hold%20The%20Flood/Rescue%20and%20Home) and [Rescue Rules](/Hold%20The%20Flood/Rescue%20Rules): a short cooperative crossing remains useful. Finite multi-stage routes need to meet the owner's short-rescue condition, and death/shift/abort ordering now has the preparation-accepted512 candidate; its old-parent alignment is verified518, with owner-dependent branches still unselected.
- [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Home Projects](/Hold%20The%20Flood/Home%20Projects): compatibility maintenance closed456 at20:15:57, revisionsacbc945c/996d235a; PM owns both parents STOPPED. Current Fork/supply, unloading, historical-route and refill rules align while the human scenes and reclaimable loans remain. This adds no package or global04 closure; the whole colony economy and emotional effect remain unvalidated.
- [Language Expedition](/Hold%20The%20Flood/Language%20Expedition), [Language and Journal](/Hold%20The%20Flood/Language%20and%20Journal) and [Language Design Evidence](/Hold%20The%20Flood/Language%20Design%20Evidence): observable repeated contexts, partial interpretations, factual arrival/incomplete records and fallible requested visual assistance. These completed focused review252 and response254, with final integration269. A transfer connection never proves a walking route. Historical evidence needs to be reconciled with shifting layouts; this does not require another whole-language review or a full conlang.
@@ 91,4 93,4 @@
The hospital draft's causes and ending, player consequences of resurrection corruption, shift/persistence rules, short rescue logistics, final colony economics and fixture detail, language details, equipment economy, numerical oxygen rules and campaign scope remain open. The 30/90/100–200hour ambitions are unproven. No game implementation, prototypes, simulations, playtests or assets are authorised. No AI art. Purchases and rare custom/authored assets require owner approval.
-
PM follows ready handoffs during authorized active work. Owner490 resumed PM, Systems and both original Claude roles, superseding the overnight489 and earlier token pauses. One-minute fallback monitoring and15-minute numeric/forecast reports resume. Actual491/494/495 dispatch states are listed above; source-specific receiving activity must be verified before calling a role working. Routine unchanged checks remain quiet between owner reports. Add specialist capacity only for a demonstrated independent need.
+
PM follows ready handoffs during authorized active work. Owner490 resumed PM, Systems and both original Claude roles. One-minute fallback monitoring and15-minute numeric/forecast reports continue. Lead36 receiving/source reads and Systems35 response521 receiving are verified; both authors are working on separate articles. Lead parents/34 remain STOPPED. Reviewer STOPPED after520. Routine unchanged checks remain quiet between owner reports. Add specialist capacity only for a demonstrated independent need.