Commit a832ec

2026-09-15 20:04:10 Anonymous: Record equipment draft in independent review
hold the flood/design plan.md ..
@@ 82,11 82,11 @@
[Who Is the Astronaut?](/Hold%20The%20Flood/Who%20Is%20the%20Astronaut) presents a repair pilot who wants a settled home and a surveyor who wants someone to share discoveries with. Both respond to the same forced docking, horde breakthrough and optional conversation about Nadi. Their wishes, enjoyment, coping habits and friction with others differ, alongside a cheaper mostly silent alternative. It preserves the player's actions, evidence and pleasure in making a powerful build. Review, response and integration completed at **19:47**. One spoken line now makes Nadi's refusal of premature movement clear. Both personalities and the quieter alternative remain available; the risk of intrusive commentary or conversations becoming lessons remains visible.
- ## Working now: can a shot carry lightning?
+ ## In review: can a shot carry lightning?
- Systems is extending [Build Comparison](/Hold%20The%20Flood/Build%20Comparison) with two approaches to the same horde: the existing banked-disc/local-arc hybrid and a proposed projectile that delivers electricity at its contact point. The comparison must show a hint, an experiment, a dangerous setup, spectacular success and a bad shot, with the change to discovery afterward. The existing three build directions remain. Any new delivery rule and its cost must be explicit; neither it nor a build priority is selected.
+ Systems has extended [Build Comparison](/Hold%20The%20Flood/Build%20Comparison) with two approaches to the same horde: the existing banked-disc/local-arc hybrid and a proposed projectile that delivers electricity at its contact point. The comparison must show a hint, an experiment, a dangerous setup, spectacular success and a bad shot, with the change to discovery afterward. The existing three build directions remain. Any new delivery rule and its cost must be explicit; neither it nor a build priority is selected.
- Systems has received the assignment and is working; independent criteria are ready. Draft target **21:30**, likely **21:00–22:15**; reviewed comparison **22:30**, likely **22:00–23:30**.
+ The draft arrived at **19:59**. Systems has stopped and the independent reviewer is working from previously saved criteria. Reviewed comparison target remains **22:30**, likely **22:00–23:30**, with its player discovery, targeting and costs still under review.
The owner has been offered three short existing experiences for reaction: horde climax, coming home and opening. That optional taste feedback can steer priorities while authorized work continues.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9