Anonymous:
PM close information package and honor owner Claude token pause
hold the flood/design plan.md ..
@@ 10,19 10,21 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **19 design packages,16 preparation-closed and3 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **19 design packages,17 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
-
| Design Lead | Player Information379 author response; retains sole article ownership | Draft375/review376 complete; response target17:00 today, range16:45–17:15; PM dispositions without a second broad review |
-
| Systems | Survival And Loadout380; owns the new article | Outline17 closed378 at16:20; survival draft target17:00, range16:45–17:15; actual380 source reads verified |
-
| Independent Reviewer | Survival and Loadout380 independent criteria then one preauthorised review | Player Information376 complete; new criteria before seeing the Systems draft, then actual submission review without another PM gate |
-
| PM | Dated forecasts, source verification, decisions and ready handoffs | M0/M1 prepared early; M2–M4 unchanged. Final layout and first-survivor questions pending; UI estimate scope reconciliation active |
+
| Design Lead | Player Information18 preparation closed387 | Paused by owner for token limits; no wakeup until owner confirms return |
+
| Systems | Survival And Loadout19 | Draft384/review385 complete; current author response388, then PM disposition |
+
| Independent Reviewer | Survival review385 complete | Paused by owner; no new review assignment or courier until owner resumes |
+
| PM | Close in-flight work, preserve forecasts and queue morning work | Owner389 pause overrides routine wakeups; hourly quiet checks during break; core11Sep/wiki22Sep unchanged |
The PM marked conflicting old rules in their owning articles after a source impact audit. Permanent map placement is superseded; remembered positions are historical; death/rescue ordering is unresolved. The next consolidated update will follow a concrete shift comparison. Do not silently treat the former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
## Ready for reaction
+
[Player Information](/Hold%20The%20Flood/Player%20Information) preparation closed387 after one review/response. It separates observed, recorded and reported information, preserves the full journal pause and short rescue limits, and sets a proposed accessibility baseline. Its full cue inventory is later work; no usability is claimed.
+
[Whole Game Outline](/Hold%20The%20Flood/Whole%20Game%20Outline) is preparation-closed378 after draft369, focused review370 and response374. It connects the opening to middle, ending and secret layers, including a later expedition and finite content bands. It is a planning scaffold: story/ending choices, quantities and complete estimate coverage remain open.
[Shifting Station Options](/Hold%20The%20Flood/Shifting%20Station%20Options) records the owner's selection of actions binding connected groups and the whole-station late puzzle. Moving districts and freely rearranged rooms remain prior alternatives. Its special local rescue reconnection is still a proposed exception, not automatic transfer.
@@ 57,4 59,4 @@
The hospital draft's causes and ending, player consequences of resurrection corruption, shift/persistence rules, short rescue logistics, full colony systems, language details, equipment economy, numerical oxygen rules and campaign scope remain open. The 30/90/100–200hour ambitions are unproven. No game implementation, prototypes, simulations, playtests or assets are authorised. No AI art. Purchases and rare custom/authored assets require owner approval.
-
PM follows ready handoffs during active work, with one-minute scheduled checks as a fallback while useful authorised work exists. Local hosts must remain available. Between scheduled owner reports, routine unchanged checks stay quiet. The owner requests a numeric progress report every15 minutes during active work, including an honest unchanged interval, plus substantive proposals, decisions and actionable outages. Add specialist capacity only for a demonstrated need.
+
PM follows ready handoffs during active work. Owner389 has paused Claude Lead/Reviewer for token limits until morning resumption is confirmed; no wakeups or replacement sessions during that pause. Hourly checks remain quiet while the team is stopped. Normal active coordination resumes only after the owner confirms availability. Local hosts must remain available. Between scheduled owner reports, routine unchanged checks stay quiet. The owner requests a numeric progress report every15 minutes during active work, including an honest unchanged interval, plus substantive proposals, decisions and actionable outages. Add specialist capacity only for a demonstrated need.