Record Campaign36 submitted count as pending, not accepted (chats 536/539)
hold the flood/production scope.md ..
@@ 23,7 23,7 @@
| Person-linked home projects | 5 | 9 / 14 | Voluntary contribution, an observable result, reclaim and personal consequence |
| Special connection challenges | 2 | 4 / 6 | Authored constraint/recovery problems, not the count of ordinary joins |
-
The current SMALL first pass is **4 regions / 24 modules / 40 rooms / 12 objectives / 4 ship assemblies / 5 people / 15 scenes / 12 equipment definitions / 6 ordinary + 3 special roles / 10 encounters including 2 setpieces / 5 mechanism families / 13 major placed mechanisms / 4 language + 4 story chains / 5 home projects / 2 special connection challenges**. These are prepared proposal counts, not an owner-selected game size. Thirteen is not every interactive object: R26/R33 service transformations, the R02/R03 board/rack, ordinary doors and join faces stay owned by their room/interface descriptions rather than becoming extra P-identities. Campaign36's final evidence-entry count is still pending its focused correction and is not inferred from its earlier nineteen-entry draft.
+
The current SMALL first pass is **4 regions / 24 modules / 40 rooms / 12 objectives / 4 ship assemblies / 5 people / 15 scenes / 12 equipment definitions / 6 ordinary + 3 special roles / 10 encounters including 2 setpieces / 5 mechanism families / 13 major placed mechanisms / 4 language + 4 story chains / 5 home projects / 2 special connection challenges**. These are prepared proposal counts, not an owner-selected game size. Thirteen is not every interactive object: R26/R33 service transformations, the R02/R03 board/rack, ordinary doors and join faces stay owned by their room/interface descriptions rather than becoming extra P-identities. Campaign36 response536 reports **26 deduplicated evidence entries**, but PM disposition and its narrow source-verification clarification539 remain pending; 26 is therefore a submitted count, not an accepted final ledger.
The 15 SMALL survivor scenes include rescue and home follow-through. Home-project scenes should be assigned within that ledger where possible; if an additional scene is necessary, record the increment instead of silently exceeding fifteen. Branches are variations of a named scene, but each materially different consequence still needs writing and state review.
@@ 75,7 75,7 @@
| Finite remainder | Unique work still required | Judgment allowance |
|---|---|---:|
-
| Campaign36 correction and disposition | Finish the actual-ID/evidence/state crosswalk against current sources; integrate only accepted factual corrections. Its final evidence count is pending. | **4–8 role-hours** |
+
| Campaign36 clarification and disposition | Resolve the narrow source-verification clarification539, verify the submitted actual-ID/evidence/state crosswalk and integrate only accepted factual corrections. Its submitted count is 26; final acceptance is pending. | **4–8 role-hours** |
| Scope/handoff37 | This two-article refresh, one focused critique, at most one reasoned response and PM disposition. | **14–24 role-hours** |
| Whole-v1 coherence disposition | One revision-specific cross-domain pass, bounded repairs only where an actual contradiction remains, and a final M3 disposition. It does not reopen every closed domain review. | **10–18 role-hours** |
| **Current finite M3 remainder** | Overlap removed; includes author/reviewer/PM work still ahead at the time of this judgment. | **28–50 role-hours** |