Commit 98ad03

2026-09-08 18:57:00 Anonymous: Replace completed parent-maintenance note with current source pointers
hold the flood/equipment acquisition and rig growth.md ..
@@ 93,7 93,7 @@
## Parent alignment, scope and unresolved interfaces
- This article follows the current Equipment Catalogue where older **Progression Options** language is ambiguous. A future Outcome 04 parent-alignment edit should make three exact changes without altering its two-option comparison: (1) replace “Pulse Projector automatically launches” with the current Threat Sensor/ready-controller event or mark it explicitly as omitted-controller shorthand; (2) describe Impact Dynamo as one local clamp on a named Barrier frame, Projector physical-output feed or fixture surface, not a remote/global impact or motion collector; and (3) state that Fork copies trigger, payload type and wave identity but splits usable payload among accepting branches with total output no greater than input, rather than implying full-copy amplification. No parent article is edited here.
+ [Equipment Catalogue](/Hold%20The%20Flood/Equipment%20Catalogue) defines part behavior and receiver acceptance; [Build Rules](/Hold%20The%20Flood/Build%20Rules) defines linked-build grammar; [Progression Options](/Hold%20The%20Flood/Progression%20Options) compares acquisition approaches. This article owns the twelve source paths, proposed area growth and property transitions, using those current mechanical rules.
This first pass advances only the acquisition/rig-growth portion of Production Scope's remaining **Acquisition, build/combat interfaces and roster** row. It reuses all twelve prepared Catalogue definitions, the four proposed Survival starters and five existing Regional part rewards. Unique v1 increments are the three source fixtures counted above, two reversible ship-side area-configuration states, one provisional repair/paired-adapter operation template, and this one cross-objective expedition trace. The template does not count an authored recovery route until its exemplar/ports, material, source and recovery details exist. The future room/mechanism inventory must place the three fixtures and their recovery controls; the roster portion of the Production row remains untouched. Do not add the Catalogue, Regional, Survival or Save first-pass envelopes again.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9