2026-09-08 17:54:19
Anonymous:
Record trap/handoff closeouts and active save-state design
hold the flood/design plan.md ..
@@ 10,19 10,23 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **21 design packages,19 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **23 design packages,21 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
| Design Lead | Player Information18 preparation closed387 | Claude paused by owner; no wakeup until owner confirms |
-
| Systems | Traps And Encounter Progression401; sole owner of new article | Equipment20 closed400; next draft18:00(17:45–18:30), reviewed18:45(18:15–19:15) today |
-
| Independent Reviewer | Permanent Claude role paused | Temporary GPT helper saved trap criteria before the new assignment/draft; PM will relay its named focused review |
-
| PM | [Design Coverage](/Hold%20The%20Flood/Design%20Coverage) published; forecasts and ready handoffs | Fifteen-domain gap map complete; only Claude paused, core11Sep/wiki22Sep unchanged |
+
| Systems | Save And Content State411; sole owner of new article | Source reads verified17:50–17:51; Traps21 closed410; next draft18:20(18:05–18:45), reviewed19:00(18:30–19:30) today |
+
| Independent Reviewer | Permanent Claude role paused | Temporary GPT helper saved fresh save/content-state criteria before assignment/draft; actual review follows submission |
+
| PM | Handoff22 closed410; coverage, proposal intake and forecasts | Five first-pass contracts/eight partial areas/two missing dedicated contracts; only Claude paused, core11Sep/wiki22Sep unchanged |
The PM marked conflicting old rules in their owning articles after a source impact audit. Permanent map placement is superseded; remembered positions are historical; death/rescue ordering is unresolved. The next consolidated update will follow a concrete shift comparison. Do not silently treat the former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
## Ready for reaction
+
[Traps And Encounter Progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression) and [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff) preparation closed410 after one focused review/response each. The five trap families have distinct observable causes and responses; the plan separates local mechanics evidence, sustained progression and production feasibility. Neither constitutes an implementation or playtest.
+
+
[Rescue Shift Proposal](/Hold%20The%20Flood/Rescue%20Shift%20Proposal) and [Station Assembly Example](/Hold%20The%20Flood/Station%20Assembly%20Example) are additional unadopted contributions under PM intake407. Protected pre-shift retreat and a guaranteed inspected-face meeting are new candidate capabilities, not answers inferred from existing owner selections. Their authorship context and geometry/authoring obligations remain pending.
+
[Equipment Catalogue](/Hold%20The%20Flood/Equipment%20Catalogue) preparation closed400 after one independent GPT review and response399. Twelve proposed reusable parts include a deliberate-movement switch and a directional nozzle. Three legal rig examples disclose capacity, activation and rewiring costs. Fork provisionally splits usable payload; exact tuning, acquisition and rig growth remain open.
[Survival and Loadout](/Hold%20The%20Flood/Survival%20And%20Loadout) preparation closed392. It proposes resource/capacity lifecycle rules and opening packing choices, including retained prepared oxygen. Exact quantities and balance remain unselected.