2026-09-09 12:42:42
Anonymous:
Record completed readiness critique559 and verified ONE response560
hold the flood/design plan.md ..
@@ 10,14 10,14 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **38 design packages,37 preparation-closed and1 open (38)**. Status is through558.38 numbers the already-planned coherence/readiness work; it adds no game scope.15 usable first-pass domains/0 partial is not M2/M3 completion. F1.14 remains M3 14September (11–18), low confidence; M2 11September (10–14), M4 10November (20October–1December). Actual38 findings may justify earlier delivery; history is preserved.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **38 design packages,37 preparation-closed and1 open (38)**. Status is through560.38 numbers the already-planned coherence/readiness work; it adds no game scope.15 usable first-pass domains/0 partial is not M2/M3 completion. F1.14 remains M3 14September (11–18), low confidence; M2 11September (10–14), M4 10November (20October–1December). Actual38 findings may justify earlier delivery; history is preserved.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
-
| Design Lead | [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness), candidate557 db448650d4af… (18,068 bytes) | STOPPED after submission12:12:42, ahead of13:30 target. Candidate plus Systems audit are in ONE critique558. No parent writes. |
+
| Design Lead | [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness), ONE response560 to critique559; initial557 candidate db448650d4af… (18,068 bytes) | WORKING; receiving12:35:14.291/full559–560 reading12:35:31.379 verified, one delivered courier. Response13:15 (12:50–14:00); reviewed38 remains16:00 (14:30–18). No parent writes. |
| Systems | Local factual source/interface audit555 for the SAME38 outcome | STOPPED after submission12:12:20.53/53 direct links resolved;13 proposed repair records, including status items already corrected556. No new article ownership or separate package. |
| PM |38 tracked /37 preparation-closed /1 open38;15 usable /0 partial | Verify38 handoffs, disposition ONE critique/response and necessary bounded repairs, then decide M2/M3. Five unanswered choices remain explicit. F1.14 dates unchanged; no extra agent or phase authority. |
+
| Independent Reviewer | Independent criteria554 and ONE combined38 critique559 complete under553 | STOPPED after559; Lead560 owns the ONE response. Earlier35/36/37 reviews remain complete. |
+
| PM |38 tracked /37 preparation-closed /1 open38;15 usable /0 partial | Prepares bounded local parent repairs while Lead560 responds, then verifies the response/repairs and decides M2/M3. Game sources remain unchanged. Five unanswered choices remain explicit; F1.14 dates unchanged, no extra agent or phase authority. |
PM's narrow parent-equipment alignment432 and legacy Discovery Chain/Expedition integration441–443 are complete. The latter preserves historical post-death routes and world-time capture with full frozen journal inspection; it grants no new access guarantee. Global04 preparation closed518 at11:07:24 after accepted577236e7 and all eleven parent alignments were independently verified. Owner-dependent branches remain unselected. Do not treat a former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
@@ 99,4 99,4 @@
The hospital draft's causes and ending, player consequences of resurrection corruption, shift/persistence rules, short rescue logistics, final colony economics and fixture detail, language details, equipment economy, numerical oxygen rules and campaign scope remain open. The 30/90/100–200hour ambitions are unproven. No game implementation, prototypes, simulations, playtests or assets are authorised. No AI art. Purchases and rare custom/authored assets require owner approval.
-
PM follows ready handoffs during authorized active work. Lead557 and Systems555 are STOPPED after their38 submissions; Reviewer558 is WORKING on the ONE combined critique after criteria554. Receiving558 and the full contract were verified at12:14:39/44. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer saved independent criteria554 and is conducting ONE critique of the stopped submission and audit. One-minute fallback and15-minute numeric/forecast reporting continue. No manual forwarding, extra agent creation or repeated35/36/37 review is required.
+
PM follows ready handoffs during authorized active work. Lead560 is WORKING on the ONE response to critique559, incorporating the submitted557 assessment and555 factual audit. Receiving was verified at12:35:14.291 Jerusalem and the full559/560 reading at12:35:31.379; one courier was delivered. Reviewer is STOPPED after559; Systems remains STOPPED after555. Lead owns only the administrative V1 Readiness article. PM is preparing bounded local parent repairs; game sources remain unchanged and no parent ownership transfer is implied. One-minute fallback and15-minute numeric/forecast reporting continue. No manual forwarding, extra agent creation or repeated35/36/37 review is required.