Commit 9569fc

2026-09-06 20:53:14 Anonymous: PMU005: restore EQP101 author submission and exact revision ledger accidentally removed during PMR004
hold the flood/tasks.md ..
@@ 43,6 43,37 @@
**Next milestone:** one coherent expanded owner proposition, not another receipt/status pass. Existing author handoffs are routine wiki coordination; posting this board does not wake a chat. No additional agent, owner relay, purchase, asset creation, code, build, prototype, simulation or playtest is needed for the assigned writing.
+ ## Preserved equipment submission — PMU005 restoration
+
+ **PM correction, 2026-09-06:** PMR004's section replacement accidentally removed the Equipment designer's submission note embedded inside the former PMU004 section. The current EQP101 task row and substantive equipment pages remained intact, but that did not preserve the author's note and revision ledger. Restored verbatim below from [Tasks d7bacb](/Hold%20the%20Flood/Tasks?revision=d7bacb). Its pending/proposed labels describe the submission moment; the current PMR004 task table and Brief D022–D024 give the subsequent dispositions. This is preservation repair, not a new submission or acceptance reversal. PM owns the mistake; no owner or Editor action is needed.
+
+ ### EQP101 — submitted equipment and build design
+
+ **2026-09-06 UTC · Equipment and Build Designer · In review; PM acceptance pending.** The owner assigned EQP101 to this role in the current session. This first substantive submission is staffing evidence; the earlier “Blocked — role not yet created” entry above predates it. No other role is claimed to have read or acted on this submission, and no task is self-accepted.
+
+ **Deliverable:** [Equipment](/Hold%20The%20Flood/Equipment#eqp101-submission) recommends twelve catalogue entries (three primaries, nine modules), retains Cutter and all seven earlier modules, and supplies three families—Circuit Harvester, Route Shepherd and Salvage Breacher—with early/middle/late choices, real branches, acquisition, exploration interactions, enemy countercases and costs. Dedicated item pages specify trigger/effect/target, space/resource costs, restrictions and combinations. [Build Paths](/Hold%20The%20Flood/Equipment/Build%20Paths) includes legal rack layouts and the focused COL-I2 response.
+
+ **Proposed changes, not adopted rules:** fixed eight-cell rack instead of six-to-nine progression; player-selected charge priority instead of most-room; explicit leakage and field-handling rules; Cutter-only Arc, completed nonlethal Prod, Rivet Driver, bounded Cable Reel and Hand Pump. Tide Glass is explicitly deferred with a reason. [Inventory and Charge](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge) is the prepared transfer destination, with E1–E8 and the source-to-destination request. Lead's author-adopted Power and Attraction remains the shared-rule authority until Lead integrates any changes.
+
+ **Current-source reconciliation:** derived from Design Document ec1b6c, then read r15 5f9fbb, shared contract 69024c, Campaign 34dc09 and COL101 a1046d published during drafting. Exact revision-linked source register is on Equipment. Took up Colony's inspection/reissue proposal, one advanced support assembly and its offered revisit-only full-rack limitation; proposed six issued equipment cells including banks/brace, which leaves two cargo cells if eight are adopted. First-visit tooling packages and costs remain cross-role proposals. No claim of a Colony response to EQP101.
+
+ **Verified saved artifacts:** each page was fetched immediately before save, all pre-existing author lines preserved, final metadata trailer removed, saved with descriptive commit text, then fetched again to confirm intended Markdown. These revisions identify the actual submission:
+
+ | Artifact | Saved revision |
+ | --- | --- |
+ | [Hold The Flood/Equipment](/Hold%20The%20Flood/Equipment?revision=a44990) | a44990 |
+ | [Hold The Flood/Mechanics/Inventory And Charge](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=73eb77) | 73eb77 |
+ | [Hold The Flood/Equipment/Utility Modules](/Hold%20The%20Flood/Equipment/Utility%20Modules?revision=087718) | 087718 |
+ | [Hold The Flood/Equipment/Coil](/Hold%20The%20Flood/Equipment/Coil?revision=a7d2d5) | a7d2d5 |
+ | [Hold The Flood/Equipment/Arc](/Hold%20The%20Flood/Equipment/Arc?revision=9b7b1d) | 9b7b1d |
+ | [Hold The Flood/Weapons/Alternative Tools](/Hold%20The%20Flood/Weapons/Alternative%20Tools?revision=e6aed6) | e6aed6 |
+ | [Hold The Flood/Equipment/Build Paths](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=a9a288) | a9a288 |
+ | [Hold The Flood/Weapons/Cutter](/Hold%20The%20Flood/Weapons/Cutter?revision=9618ad) | 9618ad |
+
+ **Remaining interfaces:** Lead dispositions rack/collection/resource changes and performs author-approved transfer; Combat dispositions targeting, finite chaining, Prod displacement and partial-group yield; Colony dispositions tooling eligibility, revisit boundary and capital prices; Campaign places first finds and meaningful route alternatives; World checks cable/drain topology against essential clue access and power/signal rules. No rule-level acceptance is inferred from the submission. No new code, assets, prototypes, simulations, playtests or duration claims.
+
+ **PM request:** review EQP101, record staffing from these artifacts and accept or assign one bounded revision. The submission is reviewable without an owner relay or a new owner permission question. Task acceptance remains PM's; design approval and development authorization remain the owner's.
+
## Earlier task sequence and review history
Maintainer: PM. Updated: PMR003 integrated-design review, 2026-09-06 UTC. Completed checkpoints are on PM Reviews.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9