**Paused for human feedback — 2026-09-09 13:05 Jerusalem.** The owner requested this checkpoint after first-pass completion. All design workers are stopped: Reviewer572, Systems573 and Design Lead574 confirm no work/write in flight. Automatic PM checks are PAUSED. Resume requires an explicit owner instruction; earlier assignments and forecast dates do not restart work.
+
+
**40 tracked outcomes: 38 preparation-closed, 2 paused, 0 active.** The complete first-pass batch is38/38 closed. M2 coherent core and M3 complete first-pass wiki were achieved on9 September at12:51:39 after [V1 Readiness](/Hold%20The%20Flood/V1%20Readiness) disposition564 and verified source repairs. All15 major domains have first-pass coverage; this is not a percentage of the finished game or approval of every provisional choice.
+
+
| Outcome | Current state | Next action after feedback and explicit resumption |
+
|---|---|---|
+
|38 — Whole-wiki readiness|Closed564; M2/M3 achieved|Use the first-pass baseline for human review|
+
|39 — [Opening Mechanism Detail](/Hold%20The%20Flood/Opening%20Mechanism%20Detail)|Paused, unaccepted draft submitted569; Systems stopped573|PM reads the actual draft; then one focused critique/response if still wanted|
+
|40 — [Paired Transfer Discovery Detail](/Hold%20The%20Flood/Paired%20Transfer%20Discovery%20Detail)|Paused, unaccepted draft submitted568; Lead stopped574|PM reads the actual draft; then one focused critique/response if still wanted|
+
|Reviewer criteria for39/40|Saved571 before either draft; Reviewer stopped572 without starting a critique|Preserve the criteria; do not review while paused|
+
+
The two detailed drafts arrived just before the pause and have not been accepted. Their new text, occurrences, quantities or refinements do not amend the first-pass baseline. No further source integration, design authoring or review is scheduled during the hold. The five outstanding owner choices remain unanswered; existing proposals and the early story draft remain revisable.
+
+
**Forecast status.** F1.15 records actual M2/M3 completion on9 September, replacing F1.14's predicted11/14 September dates. There is no remaining M3 task or forward10–18-hour coherence allowance. The previous detailed-campaign estimate was10 November (20 October–1 December), low confidence; it and the same-day39/40 targets are now **on hold**, to be rebased after feedback/resumption. Paused time is not counted as agent work. No additional agent or implementation phase is required for the human review.
+
+
All work remains design only. No code, build, simulation, playtest, purchase or game asset is authorized by first-pass completion or this pause.
+
+
## Historical record through message560
+
+
The following is retained unchanged apart from heading depth as a dated record. Its old current-status, ownership, remaining-work and scheduling statements are superseded by the pause and completion record above; they are not active instructions. Detailed F1–F1.14 forecasts and earlier deliveries remain available here.
+
+
## Hold The Horde — Design Coverage
+
**PM coverage assessment,9 September2026; current status through560.**15 usable first-pass domains/0 partial remains the classification depth; it is not M2/M3 completion.38 now numbers the previously planned final coherence/readiness work, with no game-scope increment.
Across fifteen major areas, **all fifteen now have usable first-pass contracts; zero remain partial at this classification depth**. This is not complete wiki v1, weighted progress or a percentage of the game.37 is preparation-closed550; whole-v1 coherence/readiness38 remains. “Written” does not mean owner-approved, implemented or validated.
@@ 8,7 31,7 @@
The first complete wiki must describe actual behavior, progression and consequences across every major area. It may use clearly labelled provisional defaults and numerical tuning; a major area left only as “TBD” does not qualify. The later detailed-content milestone specifies the individual authored rooms, clues, encounters and scenes.
-
## Remaining first-pass work
+
### Remaining first-pass work
SMALL below is the outline's proposed planning sample, not an adopted game size. Counts help expose work and may change after the scope decision.
@@ 30,7 53,7 @@
| Content scope and production feasibility | Usable refreshed [Production Scope](/Hold%20The%20Flood/Production%20Scope),37 closed550 at68db46ea | **M3:** check the accepted scope/reuse/depth and packet references in38 coherence; repair actual defects only. **M4:** detailed per-instance authoring/production specification; no overlapping labor totals | Historical144–247 is not a remainder.14–26 at response549 included now-closed37 work; only10–18 coherence role-hours remains forward. M4 350–590 is conditional; bands/cuts and actual asset suitability remain proposed. |
| Development and validation handoff | Usable refreshed [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff),37 closed550 at59945901 | **M3:** include the revision-specific packet and dependencies in38 readiness disposition. **Later:** separately authorized implementation and validation | Concrete packet has finite scope, normal/recovery cases, target/staffing/estimate assumptions and stop criteria.289–490 role-hours/5–8 working weeks is conditional, not a development start or authorization. |
-
## M3 finish map
+
### M3 finish map
These are existing-scope completion clusters. The previously unnumbered final coherence disposition is now38; its Lead assessment, Systems factual support and ONE review form one outcome, not three new scopes.
@@ 46,7 69,7 @@
Full scripts, all string/glyph occurrences, exhaustive state/layout permutations and implementation are outside these M3 clusters. They remain visible M4/later work. A missing major mechanical rule cannot be replaced by a UI label or a list of unanswered questions.
-
## Work sequence and forecast
+
### Work sequence and forecast
| Window, Jerusalem dates | Planned result | Staffing/dependency |
|---|---|---|
@@ 60,7 83,7 @@
Shared integration outcome04’s narrow parent-equipment alignment432, legacy Discovery Chain/Expedition slice441–443 and Coming Home/Home Projects compatibility456 are complete. The legacy slice replaces stale route/journal clauses with no new access guarantee;456 aligns home parts/supply, deliberate unloading, historical routes and refill conservation, with PM STOPPED ownership of both home parents. The coherent continuity candidate577236e7 and eleven aligned parents were independently verified; global04 closed518 at11:07:24. Current mechanical ownership follows533: ten parents/Continuity Systems STOPPED, Home/Information PM STOPPED; other prior Lead parents STOPPED. Owner-dependent branches remain unselected. A pending choice blocks only the rules that actually depend on it, not every parallel stream. Global04 independent positions were compared485; the new protected-retreat versus injury/loss preference is the fifth unanswered owner question. Spent supplies and new-route discovery remain explicit costs of the proposed protected branch, not accepted canon.
-
## Estimate accounting
+
### Estimate accounting
The outline's **111–208 role-hours is a partial original specification allowance, not remaining labor**. Its survival and information first-pass packages are now prepared. The later survival22–39 and information35–59 role-hour envelopes describe deeper inventories; they are not measurements of elapsed effort and must not simply be added to the old total. Equipment's first-pass allowance likewise differs from its later detailed catalogue.