2026-09-08 16:47:11
Anonymous:
PM day close: survival prepared and owner pause respected
hold the flood/design plan.md ..
@@ 10,12 10,12 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **19 design packages,17 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **19 design packages,18 preparation-closed and1 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
| Design Lead | Player Information18 preparation closed387 | Paused by owner for token limits; no wakeup until owner confirms return |
-
| Systems | Survival And Loadout19 | Draft384/review385 complete; current author response388, then PM disposition |
+
| Systems | Survival And Loadout19 | Preparation closed16:45; Systems stopped, next work queued for morning |
| Independent Reviewer | Survival review385 complete | Paused by owner; no new review assignment or courier until owner resumes |
| PM | Close in-flight work, preserve forecasts and queue morning work | Owner389 pause overrides routine wakeups; hourly quiet checks during break; core11Sep/wiki22Sep unchanged |
@@ 23,6 23,8 @@
## Ready for reaction
+
[Survival and Loadout](/Hold%20The%20Flood/Survival%20And%20Loadout) preparation closed392. It proposes resource/capacity lifecycle rules and opening packing choices, including retained prepared oxygen. Exact quantities and balance remain unselected.
+
[Player Information](/Hold%20The%20Flood/Player%20Information) preparation closed387 after one review/response. It separates observed, recorded and reported information, preserves the full journal pause and short rescue limits, and sets a proposed accessibility baseline. Its full cue inventory is later work; no usability is claimed.
[Whole Game Outline](/Hold%20The%20Flood/Whole%20Game%20Outline) is preparation-closed378 after draft369, focused review370 and response374. It connects the opening to middle, ending and secret layers, including a later expedition and finite content bands. It is a planning scaffold: story/ending choices, quantities and complete estimate coverage remain open.