2026-09-08 19:11:19
Anonymous:
Record acquisition closeout, combat roster work and revised coverage
hold the flood/design plan.md ..
@@ 10,19 10,21 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **26 design packages,24 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **27 design packages,25 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
| Design Lead | Player Information18 preparation closed387 | Claude paused by owner; no wakeup until owner confirms |
| Independent Reviewer | Permanent Claude role paused | Temporary GPT focused review active on actual429/source58ea915a, using criteria5591f066 saved before draft and root-verified. Systems remains the stopped author; one critique and one response precede PM disposition. |
-
| PM | Targeted parent-equipment alignment drafts for04; intake and forecasts | Narrow read-only audit complete and full report174b4132 read; exact local drafts being prepared for PM publication. Global owner-dependent branches remain open. [Production Scope24](/Hold%20The%20Flood/Production%20Scope) stays closed423; seven first-pass contracts/eight partial areas, core11Sep/wiki22Sep unchanged. |
+
| Systems | [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster); sole author under435 | Native handoff delivered once; actual receiving activity18:58:15.181 Jerusalem verified. Author active; draft19:45(19:25–20:15), reviewed20:30(20:00–21:15), today. Acquisition26 closed434 at18:57:01; its article remains Systems-owned and STOPPED. |
+
| Independent Reviewer | Permanent Claude role paused | Acquisition26’s one critique/response is complete. Roster27 reviewer criteriafe995f61 were saved before435/new27 exposure, fully PM-read and registered437; reviewer is stopped awaiting the actual draft. One focused critique and bounded response precede PM disposition; no broad re-review of26. |
The PM marked conflicting old rules in their owning articles after a source impact audit. Permanent map placement is superseded; remembered positions are historical; death/rescue ordering is unresolved. The next consolidated update will follow a concrete shift comparison. Do not silently treat the former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
## Ready for reaction
+
[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth) preparation closed434 at18:57:01 Jerusalem, finalf5f6d7681325bc5e52d1a7503133a15d8e4293f55df3961fe6f7210b9503db6e. The complete twelve-part contract maps four proposed starters/eight physical sources, counts three added fixtures and separates active-area growth from carrying capacity. One focused critique/response clarified independent receiver acceptance, possible spent-cargo loss after downstream refusal, the unplaced repair/adapter template and the bounded empty-ship guarantee. Late author notice436 records pre-maintenancef7ede725; PM’s paragraph-only maintenance433 and final434 remain current. Acquisition preference, starter/capacity choices, source-fixture detail and exceptions remain open.
+
[Regional Discovery Map](/Hold%20The%20Flood/Regional%20Discovery%20Map) preparation closed426 at18:32 Jerusalem, final3acda0183b13d531e5e93cfd7ef41909c33b19d970bdb4b0b3c01f4360427247. One focused review/response made both evidence orders concrete, replaced the abstract central gate with a pressure iris and recovery alternative, and clarified calibration, rig capacity and source/access conditions. Four regions and twelve objectives remain a SMALL proposal;24module/40room v1 briefs, physical placements and story/ending choices still need work.
[Save And Content State](/Hold%20The%20Flood/Save%20And%20Content%20State) preparation closed417 at18:09:56 Jerusalem, final438cdf35f53bb537aed50bb8efab810866b289d6cf401b949d95bc7e27e8938c. One focused review/response clarified the carried rig/cargo set, actual person-and-airlock delivery, historical evidence and the provisional save-policy boundary. This is a first-pass continuity contract, not verified software; save policy, rescue/death/shift order, full-station behavior, transients and recovery remain open.
@@ 31,7 33,7 @@
[Rescue Shift Proposal](/Hold%20The%20Flood/Rescue%20Shift%20Proposal) and [Station Assembly Example](/Hold%20The%20Flood/Station%20Assembly%20Example) are additional unadopted contributions under PM intake407. Protected pre-shift retreat and a guaranteed inspected-face meeting are new candidate capabilities, not answers inferred from existing owner selections. Their authorship context and geometry/authoring obligations remain pending.
-
[Equipment Catalogue](/Hold%20The%20Flood/Equipment%20Catalogue) preparation closed400 after one independent GPT review and response399. Twelve proposed reusable parts include a deliberate-movement switch and a directional nozzle. Three legal rig examples disclose capacity, activation and rewiring costs. Fork provisionally splits usable payload; exact tuning, acquisition and rig growth remain open.
+
[Equipment Catalogue](/Hold%20The%20Flood/Equipment%20Catalogue) preparation closed400 after one independent GPT review and response399. Twelve proposed reusable parts include a deliberate-movement switch and a directional nozzle. Three legal rig examples disclose capacity, activation and rewiring costs. Fork provisionally splits usable payload. Acquisition/growth paths are now prepared in26; exact tuning and owner selection remain open.
[Survival and Loadout](/Hold%20The%20Flood/Survival%20And%20Loadout) preparation closed392. It proposes resource/capacity lifecycle rules and opening packing choices, including retained prepared oxygen. Exact quantities and balance remain unselected.