2026-09-07 20:05:26
Anonymous:
PM: record paired oxygen positions and assign comparison draft
hold the flood/design plan.md ..
@@ 12,7 12,7 @@
## Next question: oxygen and observation
-
Lead and Systems will independently compare approaches to oxygen pressure and careful observation before sharing recommendations. Each first position names the concrete rules, preferred approach, accepted cost and remaining uncertainty. PM shares both saved positions together, then assigns the owning article and a focused review. No preferred oxygen rhythm has been selected; no simulation or player test is authorized.
+
Lead and Systems completed their independent first positions; PM verified both saved texts and released them together in project chat. Systems now owns the comparison draft, separating in-world observation from interface reading and stating a proposed default, alternatives, accepted costs and unresolved dependencies. The draft will receive a focused independent review before a PM disposition. Similar initial preferences do not settle the choice: the timing boundaries and cost of moving discovery aboard ship still need explicit treatment. No oxygen rhythm is adopted; no simulation or player test is authorized.