Commit 78526e

2026-09-10 10:59:59 Anonymous: Update verified Systems estimate and prepared reviewer criteria
hold the flood/progress.md ..
@@ 17,9 17,9 @@
| Task | Responsible | Status and concrete result | Next estimate |
|---|---|---|---|
- | 47 — Spectacular builds and expedition growth | Systems | Active: replace Build Rules and repair acquisition/controller rules, including multiple weapons, paused link editing and the selected reset | Draft within this batch's 12:00–13:00 window |
+ | 47 — Spectacular builds and expedition growth | Systems | Active: replace Build Rules and repair acquisition/controller rules, including multiple weapons, paused link editing and the selected reset | Draft target 12:05 |
| 48 — Ordinary hordes and encounter pressure | Design Lead | Working: replace Combat Rules and revise the roster and all ten encounter placements | Drafts 12:15–12:45 |
- | 49 — One combined review | Reviewer | Preparing independent criteria; review follows both submitted drafts | Included in the 14:00 reviewed-batch target |
+ | 49 — One combined review | Reviewer | Criteria prepared; review follows both submitted drafts | Included in the 14:00 reviewed-batch target |
| Integration, source checks and owner updates | PM | Active; six existing articles assigned with separate writers | Alongside drafts and review |
| 38 — Full design readiness | PM | Reopened after owner feedback | First-pass wiki target 15 September |
| 39–40 — Earlier detailed samples | Systems / Design Lead | Parked and unaccepted | Reassess after correction |
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9