Commit 75ff4d

2026-09-07 09:13:06 Anonymous: PMR007: update task dispositions with exact evidence and a single Tram integration handoff
hold the flood/tasks.md ..
@@ 1,5 1,24 @@
# Hold the Flood — Design Tasks
+ ## PMR007 — current review and bounded assignments
+
+ **2026-09-07 · [Review, specific corrections and exact revisions](/Hold%20the%20Flood/PM%20Reviews/PMR007).** This table is the current disposition; older dated tables below are evidence/history, not commands to repeat delivered work. The original PMU007 depth criteria remain the acceptance standard. Correct effects are agreed; whole-game acceptance is withheld. Source hashes and narrow review scopes are on PMR007, not inferred from task receipts.
+
+ | Task | Owner | Evidence-backed status | Next useful action |
+ | --- | --- | --- | --- |
+ | DES104 → DES105 | Existing Lead | Integration changes required at [Campaign 9366c8](/Hold%20The%20Flood/Campaign?revision=9366c8); canonical decisions credited at [contract 8644ea](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=8644ea) | Use **Tram** as the common first/changed/later-return case. Integrate EQP102/COL102/WLD104, legal issue and reachable evidence order. Correct seven-cell berth-supported start and decide one consistent initial Exchange permission state. No larger issue cap or new omnibus document |
+ | CAM102 / CAM103 | Campaign and District Designer, with Lead on current authored districts | Exchange changes required at [5bc625](/Hold%20The%20Flood/Districts/The%20Exchange?revision=5bc625); clearer baseline accounting credited at [Districts e1136a](/Hold%20The%20Flood/Districts?revision=e1136a), not duration accepted | PMR007 §1/2/5: correct Exchange dispatch, fuel/rack/expiry/retrieval ledger and bank start; Collector winch versus 2 s power; provide actual Tram apron/manual return/offers and 30 s crossing or reject that location. Merge/justify observation-only repeat trips before changing the count |
+ | CMB101 / CMB102 | Combat and Enemy Designer | Current effect table credited at [6129ea](/Hold%20The%20Flood/Mechanics/Combat?revision=6129ea); live-copy corrections still required | Remove §0.2 unresolved C2 paragraph, §6 Spark-stun/most-room clauses and old presentation count. Then countersign or revise EQP102's three approaches against targeting, press and pursuit; no readability/balance claim from role-count limits |
+ | EQP101 | Equipment and Build Designer | Effect/interface contribution accepted at [dc3aa2](/Hold%20The%20Flood/Equipment?revision=dc3aa2), with [Arc fc64bb](/Hold%20The%20Flood/Equipment/Arc?revision=fc64bb); newer Equipment r4 and Coil/Inventory/Utility mirrors scoped in PMR007 | Equipment r4 already retires its pending Cable/Spark requests; no redo. Collector mechanism stays Campaign-owned. No blanket catalogue/asset acceptance |
+ | EQP102 | Equipment and Build Designer | Accepted as a delivered contribution at [Build Paths 6bc3f7](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6bc3f7); integration pending, not CMB102 acceptance | Carry three legal small-start approaches plus bundle → 3 charge → 30 s lure into DES105. Coordinate exact offers/ground with Campaign and targeting with Combat; reject an unsupported short crossing. Broader catalogue depth remains unproven |
+ | COL101 / COL102 | Colony and Progression Designer | COL101 targeted corrections accepted; COL102 two-path contribution accepted at [fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88), conditional on shared route/acquisition | Mirror D026: comparison joins base receiver, one assembly for tooling or berth. Match the integrated Tram case and Equipment's smaller-package revisit clarification. Equal investment opportunities are not guaranteed income; no hauling tax |
+ | WLD104 | World and Mystery Designer | In review — targeted changes required at [e99445](/Hold%20The%20Flood/World%20And%20Mystery?revision=e99445) | Reorder clue/action chain onto accessible Lock Flight → Tram → Exchange → Collector progression and actual returns; clarify independent evidence for harvesting. Fix grounded-run persistence row. Mirror D026; do not sell bank state already on free prelaunch board |
+ | REV104 → REV105 | Independent Design Critic | REV104 contribution accepted at [ce94e4](/Hold%20The%20Flood/Design%20Review?revision=ce94e4), with closure qualification | Verify Combat/World residual copies identified by PMR007. Keep Exchange 16–18 open until corrected. Review depth only against the actual combined DES105 revision; do not certify readiness from isolated countersigns |
+ | D025 / REF110 | Lead + Reference Researcher | [Asset Audit fa674c](/Reference/Asset%20Audit?revision=fa674c) received/reviewed as bounded source/licence report, not suitability acceptance | Distinguish located sources, style/pose/animation uncertainty, adaptation work and gaps. Engine-drawn cues are not zero authoring. Correct Campaign §10's stale none-located statement; no purchase/custom request yet |
+ | EXT102 / TRL / CLR102 | Existing review contributors | X33 response credited, positioning deferred; [X32 5f950c](/Hold%20The%20Flood/External%20Critique?revision=5f950c) substantively addressed by EQP102 in its scope; Clarity reports no open item | Reassess actual design argument, not citation counts. Cold owner-path read after DES105 exists; at most three consequential findings. No duplicate demand for already delivered independent review |
+
+ **D026:** provisional next-draft simplification on Brief; no owner approval implied. Reference comparisons are not launch quotas. Existing team is sufficient. A wiki assignment does not wake another chat. All work remains textual design/review: no game code, build, prototype, simulation, playtest or unapproved asset creation.
+
## Current work — resumed 2026-09-07: depth across repeated expeditions
**Owner instruction:** after PM's state-of-design report, the owner said “sounds good. resume.” The overnight pause is lifted for the design process. PM's hourly review is enabled. This is approval to continue design work under the recommended priorities, not approval of the game design, a district/hour target, purchases, authored assets or development. Existing specialists retain ownership; a wiki assignment does not establish that another chat has resumed.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9