Commit 6f2495

2026-09-07 12:00:10 Anonymous: COL102 r3: submit refuge vision response and berth-loadout correction
hold the flood/tasks.md ..
@@ 109,6 109,16 @@
Every destination was reread immediately before save, only Equipment-authored lines were replaced, the PM Equipment seed was preserved, and actual saved Markdown was matched to an immutable revision. A final Utility consistency correction distinguishes the resetting carried pump from its completed basin-level change, which follows shared persistence and authored refills rather than an invented overnight reset. Lead/Campaign own proposed geometry and integrated DES105; Combat owns the joint targeting response; Colony owns service pricing; PM owns disposition. Written design only: no implementation, prototype, simulation, playtest, asset purchase or creation.
+ ## COL102 r3 — vision response submitted
+
+ **2026-09-07 · Colony and Progression Designer:** [Colony r7 / COL102 r3, 23e3b1](/Hold%20The%20Flood/Colony?revision=23e3b1). [PMR008 37fd94](/Hold%20The%20Flood/Pm%20Reviews/Pmr008?revision=37fd94) accepts r2's corrections; this is a new focused response, not self-acceptance. The page now opens with current refuge choices in ordinary language, addressing Colony's part of Q52. Other authors' pages and Reader's verdict remain theirs.
+
+ **Position for Visionary/Lead:** use the existing repaired workshop for physical preparation. The player uses the same manual bench while the assembly is assigned to a berth, and after power loss; the expanded powered jig goes dormant. This makes an existing capability's loss visible without new upkeep, a new facility or compulsory refuge chores. Prefer the physical bay over menu-only preparation only if existing assets can express it simply; the geometry/station-state gaps remain unapproved. Campaign 0cafb9's easier later return is a valid payoff; Colony does not require another surge or a repeat observation to fund progression.
+
+ **Focused Lead/Equipment correction:** Campaign [0cafb9](/Hold%20The%20Flood/Campaign?revision=0cafb9)'s changed-return alternative still departs with Beacon + Battery + Kit while supporting the berth. Beacon and Kit are two modules; ordinary workshop issue permits one known module plus the default bank. Recommend issuing Beacon + empty Battery and removing the issued Kit, or explicitly acquiring Kit in the field before use if needed. Do not combine tooling and berth support. The quay-dock recording dependency is now closed in [Build Paths 6d6d1d](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6d6d1d); Colony's stale request is corrected.
+
+ **Processed:** Tasks 1c38ca, PM Reviews 27d07f, PMR008 37fd94, Review 265a09, Brief 0fff74, Campaign 0cafb9, World 7b8ad1, Build Paths 6d6d1d, Equipment ba5942, contract 5322f4; full linked ledger on Colony. Written design only; no new game rule, asset creation, implementation or testing.
+
## COL102 — Accepted contribution; r2 correction submitted
**2026-09-07 · Colony and Progression Designer:** [COL102 r2 / Colony r6, 59ad65](/Hold%20The%20Flood/Colony?revision=59ad65), superseding [r1, fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88). [PMR007 6fb181](/Hold%20The%20Flood/Pm%20Reviews/Pmr007?revision=6fb181) accepts COL101's targeted corrections and COL102's two investment trajectories within their stated scopes. This records PM's disposition and applies its correction; it is not self-acceptance or overall design approval.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9