2026-09-08 20:59:10 Anonymous: Record Story30 closure and Cast31 submission/review; forecast F1.12
hold the flood/design coverage.md ..
@@ 1,12 1,10 @@
# Hold The Horde — Design Coverage
- **Latest handoff — 8 September, 20:37 Jerusalem:** Story30 has completed its one focused review. Systems is working on consolidated response464; receiving20:36:45.498 verified. The correction specifies historical evidence and what remains observable before/after core isolation. Reviewer stopped. Counts remain30 tracked/28 preparation-closed/2 open, coverage11 usable/4 partial; reviewed delivery22:15(21:30–23:00) and wiki22Sep(18–29) unchanged. The dated details below retain the submitted463 snapshot until this response is dispositioned.
-
**PM coverage assessment, 8 September 2026.** This is the remaining-work map for the [whole-game outline](/Hold%20The%20Flood/Whole%20Game%20Outline), alongside the dated [Progress and forecast](/Hold%20The%20Flood/Progress). It is management work, not an additional completed gameplay package.
- Across fifteen major areas, **eleven have usable first-pass contracts and four have examples or alternatives**. These are coverage categories, not weighted progress or a percentage of the game. Even an area with usable rules still needs its finite content, edge cases and integration. “Written” does not mean owner-approved, implemented or validated.
+ Across fifteen major areas, **twelve have usable first-pass contracts and three have examples or alternatives**. These are coverage categories, not weighted progress or a percentage of the game. Even an area with usable rules still needs its finite content, edge cases and integration. “Written” does not mean owner-approved, implemented or validated.
- Four domains remain partial: regional progression, death/shifts/connections, story/endings/corruption, and authored cast/short rescue. Accepted rules still need their finite inventories and integration before v1 is complete. Two Language Discovery Map29 supplies the newly usable language/discovery contract; previously prepared categories are not counted again. This classification does not complete the five cast arcs/fifteen scenes,24module/40room, ten-encounter or twelve-mechanism inventories.
+ Three domains remain partial: regional progression, death/shifts/connections, and authored cast/short rescue. Accepted rules still need their finite inventories and integration before v1 is complete. Story And Ending Map30 supplies the newly usable story/ending contract; previously prepared categories are not counted again. This classification does not complete the five cast arcs/fifteen scenes,24module/40room, ten-encounter or twelve-mechanism inventories.
The first complete wiki must describe actual behavior, progression and consequences across every major area. It may use clearly labelled provisional defaults and numerical tuning; a major area left only as “TBD” does not qualify. The later detailed-content milestone specifies the individual authored rooms, clues, encounters and scenes.
@@ 24,8 22,8 @@
| Combat and contested work | Usable [Combat Rules](/Hold%20The%20Flood/Combat%20Rules) and [combat-state contract27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), prepared443 | Remaining interface/edge-case matrix for controllers, target assistance, combined attacks, oxygen actions and recovery | Shared first-pass state sheet prepared19:34 atf1fe0d9a. Target assistance, multiple ordinary controllers and field healing remain proposals; exact timing and readability are unvalidated. |
| Enemies, encounters and traps | Usable [roster/pressure contract27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), prepared443, alongside five [trap families](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression) | Ten encounter-placement and twelve placed-mechanism v1 briefs: actual geometry/populations, cue variants, warning/work stages, reset/rearm/persistence and recovery; exhaustive variants remain M4 | Six ordinary/three special roles and two setpieces are prepared within ten encounters; ten of twelve mechanism slots allocated. Full inventories are still partial, and counts/origins remain replaceable proposals. |
| Two alien languages and discovery | Usable [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map), preparation-closed459 atdf0f48f5, alongside existing journal/utterance examples | Actual clue/string and physical-state variants, placed-room inputs/controls and both-order missed-evidence recovery briefs; final language origins and story remain unselected | Four proposed chains and two-language/two-register classification prepared20:23:52 after one focused critique/response. One local iris plate/input/state variant counted within the existing mechanism. Complete room placements, every clue permutation and comprehension validation remain unfinished. |
- | Story, endings and corruption | Partial: existing story/corruption alternatives; [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) submitted463, review under462 | Proposed causal spine and four mystery/personal chains; evidence/action map across apparent, deeper and optional-secret layers; visible choices, human consequences, both regional orders and unique-scope ledger | Systems STOPPED after draft463 at20:30:02, sourcee902a631; one review underway under462 against unchanged pre-draft criteriab1a66b77. Draft21:15 target achieved early; reviewed22:15(21:30–23:00) remains forecast, today8Sep Jerusalem. Final canon, ending count, mortality/corruption and full-station payoff remain unselected; no owner answer is inferred. |
- | Authored cast and short rescue | Two [first-survivor alternatives](/Hold%20The%20Flood/First%20Survivor) and local examples | Five SMALL cast briefs: motives, disagreements, bounded knowledge, home contribution, three-scene arc and short rescue outcomes | The first-survivor choice and global mortality affect specific branches. Other characters and living crossings can proceed. |
+ | Story, endings and corruption | Usable [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map), preparation-closed466 at03c9cb8e, alongside existing alternatives | Actual clue/archival placements, isolation/diagnostic/culture state and scene variants, final canon/creative branches and owner-selected departure/save behavior | Four mystery/personal chains and apparent/deeper/optional-secret layers prepared20:42:22 after one focused critique/response; five proposed human scene variants still need unique cast/scene allocation. Captive/empty-core, treatment, reversibility and departure remain proposals. Credits/continue-before-departure versus permanently ending the save is now an unanswered fourth owner question; no phase or canon is selected. |
+ | Authored cast and short rescue | Partial: first-survivor alternatives and local examples; [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) submitted470, review under469 | Five SMALL cast briefs with motives, disagreements, bounded knowledge, contributions, short rescue outcomes and fifteen unique scene briefs, three primary scenes per person | Submitted20:53:50 atadb7b4a4; Systems STOPPED. One review under469 against criteriae87d7950 registered467. Draft21:30 target achieved early; reviewed22:30(22:00–23:30) remains forecast, today8Sep Jerusalem. First-survivor selection/global mortality affect specific branches; submission does not finish the cast inventory. |
| Colony and home projects | Usable [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop), preparation-closed450 at5bff3436, alongside Coming Home/Home Projects | Exact fixture/control and cue briefs, participant/facility state integration and owner-dependent management/economy branches; five final cast arcs/15scenes remain in the separate cast inventory | Closed20:01:12 Jerusalem after one focused critique/response. Living/death return, deliberate storage/sharing, refill, five optional projects and loan/reclaim are prepared, with two reused/three new projects and three new fixed ship fixtures. Counts/names/benefits remain proposed; first-survivor selection and gameplay validation remain open. |
| Information, controls and accessibility | Usable [first-pass contract](/Hold%20The%20Flood/Player%20Information) | Cue/interaction inventory, journal/manifest structure and option/default interactions, including non-colour/non-audio equivalents | Most work can proceed. Mechanical uncertainties affect their particular displays. Full journal pause is settled. Existing article ownership must be respected. |
| Save, identity and content authoring | Usable [first-pass contract](/Hold%20The%20Flood/Save%20And%20Content%20State), preparation-closed417 at438cdf35 | Complete transition/commit catalogue, placement/reference matrix and resolved conditional branches and recovery policy | First-pass identity/continuity requirements are prepared. Save policy, rescue/shift order and full-station behavior remain open; engineering/migrations remain later. |
@@ 36,7 34,7 @@
| Window, Jerusalem dates | Planned result | Staffing/dependency |
|---|---|---|
- | 8 Sep | Language29 prepared459; home-parent compatibility456 complete; Story30 submitted463 | PM and GPT review work continues; Systems STOPPED after the20:30:02 draft. One focused review underway under462 against unchanged criteria registered460; no acceptance yet. Both original Claude roles stay paused; specialist setup9–10Sep remains planned, not active. |
+ | 8 Sep | Story30 prepared466; prior contracts and narrow04 compatibility complete; Cast31 submitted470 | PM/GPT review work continues. Systems owns STOPPED Story30 and submitted Cast31; actual47020:53:50 follows verified receiving20:48:13.898. One review under469 against criteriae87d7950; no acceptance yet. Both original Claude roles stay paused; specialist setup9–10Sep remains planned, not active. |
| 9–11 Sep, core buffer to 14 Sep | Shared core rules and identity requirements; start region, cast, language and production work | Two additional specialist setups planned 9–10 Sep. Ready scopes, not provider availability alone, determine assignments. |
| 14–18 Sep | Domain designs and finite inventories sufficiently concrete for cross-domain review | Content counts and major story/mechanism choices must be dispositioned or visibly provisional. |
| Target 22 Sep; likely 18–29 Sep | Complete first-pass wiki with integrated interfaces and a development handoff outline | PM integration and review are on the critical path; more writers do not remove that work. |
@@ 52,4 50,4 @@
Track deliverable and depth separately: first-pass rule set, finite content inventory, and later implementation. Count a shared survivor scene/colony project/clue/region objective once, then estimate only its distinct additional work. Keep package review/response, PM cross-page integration and whole-game coherence review separate without double counting. Production24's response explicitly assigns the24module/40room/12mechanism v1 brief minimums to one20–34author-hour package, beyond objective allocation. This retains the placed-mechanism obligation rather than silently deferring it. Detailed campaign authoring extends these briefs; do not charge both full depths. See [Production Scope](/Hold%20The%20Flood/Production%20Scope) for the proposed revised144–247role-hour v1 allowance and separate review/response/integration; it is the dated8Sep planning estimate, not logged labor or an automatically current remaining balance; subtract accepted scope before recomputing the remainder.
- This map is based on the current owner brief, Whole Game Outline revised through narrow alignment432 at2d6de3c0, the linked owning articles and a source-by-source PM coverage audit. The catalogue was subsequently read at submission396, received one focused review/response397/399 and was preparation-closed400 at revision737b3cfd. Outcome21 trap/encounter and22 handoff first passes were closed410;23 save/content-state closed417 at18:09:56 Jerusalem, final438cdf35. Production24 closed423 after scoped response421/422; Regional Discovery Map25 closed426 after response425 at3acda018. Its objective map leaves the domain partial pending24module/40room briefs. Acquisition26 closed434 at18:57:01, finalf5f6d768, after actual429, one focused critique431, the verified author response and PM’s paragraph-only maintenance433. Late notice436 records pre-maintenancef7ede725 rather than a rollback. PM now classifies equipment/acquisition as a usable first-pass contract, with source-fixture detail and exceptions still required. Combat And Enemy Roster27 closed443 at19:34, finalf1fe0d9a, after one focused critique and the442 response. PM now classifies the existing enemy/encounter/trap category as usable first-pass; the already usable combat category is not counted again. Exact40room/ten-encounter/twelve-mechanism inventories remain incomplete. Home And Colony Loop28 closed450 at20:01:12, final5bff3436, after one focused critique and449response. Home/colony was thereby classified usable first-pass; five final cast arcs/15scenes and exact fixture/control details remain unfinished. Two Language Discovery Map29 closed459 at20:23:52, finaldf0f48f5, after one focused critique and458response. Only the existing language/discovery category now advances, bringing the current total to11usable/4partial. Story And Ending Map30 was submitted463 at20:30:02, sourcee902a631, with pre-assignment criteriab1a66b77 registered460; one review is underway under462 and Systems STOPPED. Submission is not a prepared story contract. Narrow legacy04 Discovery114e9267/Expedition836ab2ae integration is verified443; global04 remains open. Scope estimates are reviewed planning assumptions, not validated labor or adopted content counts. The separately found Rescue Shift Proposal and Station Assembly Example remain unadopted intake407, not completed shared integration. The management checkpoint retains the exact inspected source revisions. No page count, model agreement or desk review establishes fun, balance, usability, performance or campaign duration.
+ This map is based on the current owner brief, Whole Game Outline revised through narrow alignment432 at2d6de3c0, the linked owning articles and a source-by-source PM coverage audit. The catalogue was subsequently read at submission396, received one focused review/response397/399 and was preparation-closed400 at revision737b3cfd. Outcome21 trap/encounter and22 handoff first passes were closed410;23 save/content-state closed417 at18:09:56 Jerusalem, final438cdf35. Production24 closed423 after scoped response421/422; Regional Discovery Map25 closed426 after response425 at3acda018. Its objective map leaves the domain partial pending24module/40room briefs. Acquisition26 closed434 at18:57:01, finalf5f6d768, after actual429, one focused critique431, the verified author response and PM’s paragraph-only maintenance433. Late notice436 records pre-maintenancef7ede725 rather than a rollback. PM now classifies equipment/acquisition as a usable first-pass contract, with source-fixture detail and exceptions still required. Combat And Enemy Roster27 closed443 at19:34, finalf1fe0d9a, after one focused critique and the442 response. PM now classifies the existing enemy/encounter/trap category as usable first-pass; the already usable combat category is not counted again. Exact40room/ten-encounter/twelve-mechanism inventories remain incomplete. Home And Colony Loop28 closed450 at20:01:12, final5bff3436, after one focused critique and449response. Home/colony was thereby classified usable first-pass; five final cast arcs/15scenes and exact fixture/control details remain unfinished. Two Language Discovery Map29 closed459 at20:23:52, finaldf0f48f5, after one focused critique and458response. Language/discovery was thereby classified usable first-pass. Story And Ending Map30 closed466 at20:42:22, final03c9cb8e, after one focused critique and465response. Only the existing story/ending category now advances, bringing the current total to12usable/3partial. Cast And Short Rescue Map31 was submitted470 at20:53:50, sourceadb7b4a4, with independent criteriae87d7950 registered467; one review proceeds under469 and Systems STOPPED. Cast remains partial until the scoped submission is dispositioned. The newly asked credits/continue-before-departure versus permanent save-ending choice remains unanswered, alongside the three earlier owner questions. Narrow legacy04 Discovery114e9267/Expedition836ab2ae integration is verified443; global04 remains open. Scope estimates are reviewed planning assumptions, not validated labor or adopted content counts. The separately found Rescue Shift Proposal and Station Assembly Example remain unadopted intake407, not completed shared integration. The management checkpoint retains the exact inspected source revisions. No page count, model agreement or desk review establishes fun, balance, usability, performance or campaign duration.