Commit 6c2100

2026-09-09 10:45:06 Anonymous: PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
hold the flood/design plan.md ..
@@ 10,34 10,40 @@
## Active outcomes
- See the dated [Progress board](/Hold%20The%20Flood/Progress): **32 design packages,30 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+ See the dated [Progress board](/Hold%20The%20Flood/Progress): **34 design packages,32 preparation-closed and2 open (04,34)**. Status is through submissions 498–499. PM reports every15 minutes during authorized active work. The adopted M3 first-pass target is14 September (11–18), low confidence; M2 remains11 September (10–14), M4 remains10 November (20 October–1 December). See Progress for assumptions and preserved forecast history.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
- | Design Lead | Player Information18 preparation closed387 | Claude paused by owner; no wakeup until owner confirms |
- | Systems | [Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory); sole author under475 | Draft477 submitted21:22:49 at15bb8454(55138bytes), explicit STOP. Draft23:00 Sep8 target achieved early; reviewed00:00 Sep9(23:15 Sep8–01:15 Sep9) remains the low-medium-confidence forecast, Jerusalem time. Native475 receiving21:13:24.363 was verified. Cast31 closed473 at21:12:44, final6456406b; Systems retains STOPPED ownership. |
- | Independent Reviewer | Permanent Claude role paused | Cast31 one critique/response complete and closed473. Room/module32 criteria6fffe707 registered474 before assignment475; the one pre-authorized review under476 is active on actual477 source15bb8454 after explicit author STOP. Submission is not accepted; PM retains consolidated response and disposition. |
- | PM | Remaining integration04, Room/module32 review, intake and forecasts | Parent-equipment432, legacy Discovery/Expedition441–443 and Coming Home/Home Projects456 compatibility complete; PM retains STOPPED ownership of the two home parents. Global04 and all four owner questions remain open. Thirteen usable first-pass contracts/two partial areas; core11Sep/wiki22Sep unchanged. |
+ | Design Lead | [Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options); sole new-article owner491 | Original Claude resumed490; submitted499 at10:42:21, source134f2e9f; STOPPED. Draft today12:00 (11:15–12:45), reviewed13:00 (12–14); actual receiving and submitted source verified. |
+ | Systems | [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity), assigned494 within existing04 |33 closed493 at5c1a9ad6; stopped ownership retained.494 received; submitted498 at10:41:54, sourceb20454c5; STOPPED. Draft12:00 (11:15–12:45), reviewed candidate13:00 (12–14), then explicit parent alignment before04 closure. |
+ | Independent Reviewer | Original role resumed; two ONE reviews preauthorized495 | Handoff495 delivered. Criteria497 saved before new drafts; earlier485/contract exposure honestly disclosed. Both submitted sources read; one focused critique each underway. No acceptance claimed. |
+ | PM |34 tracked /32 preparation-closed /2 open (04,34);14 usable /1 partial | Coordinate verified handoffs, five unanswered owner questions, finite mechanical/reference interfaces, scope/handoff and final coherence. M3 now adopted14Sep (11–18), low confidence; M2 remains11Sep and M4 remains10Nov. |
PM's narrow parent-equipment alignment432 and legacy Discovery Chain/Expedition integration441–443 are complete. The latter preserves historical post-death routes and world-time capture with full frozen journal inspection; it grants no new access guarantee. Global04 and death/rescue ordering remain unresolved. Do not treat a former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
+ **Remaining M3 scope and staffing:** use the [Coverage finish map](/Hold%20The%20Flood/Design%20Coverage):04 continuity/parent alignment,34 main information/options, representative mechanical/quantity and actual-ID reference checks, finite scope/handoff and one coherence disposition. Full scripts and exhaustive variants belong to M4. **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. No extra agent creation is required today; a10Sep technical/production candidate is useful only for a concrete independent handoff gap. Next ordinary forecast review9Sep18:00. Earlier Sep22/Sep25 scenarios remain historical; yesterday’s F1.14 draft was unpublished.
+
+ **New rescue question now with the owner (485):** if the astronaut dies during an eligible short rescue, use a protected retreat that leaves the survivor alive and unsent in the prepared refuge before one shift, with spent supplies still spent and a new short route to find; or allow danger and prepare concrete injury/loss options for a later choice. The proposed protection is new and unselected. No answer is inferred; the earlier four questions remain pending, making five.
+
## Ready for reaction
+ [Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation closed493 on9 September10:32:09, final `5c1a9ad663ead360b3b80a66caca4e724d91dac38d50979d70f1d460bd0c23d2` (57,934 bytes), after one critique/response and narrow PM integration492. Ten encounters INCLUDE two setpieces; thirteen major mechanism briefs are prepared. Later E03 population enters only at a later death-shift boundary, and reset faces preserve self-contained hosts. Systems retains stopped ownership. Room32 closed481 with24 modules/40 rooms; compact relationships and ordinary service-interface obligations remain explicit. No owner-selected game size, full arrangement proof or gameplay validation is claimed.
+
[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation closed473 at21:12:44 Jerusalem, final6456406b101845e6c9a6563a69fc7f56c1dcc7bf8227445bf14a03fa072f5514. Five proposed people have fifteen uniquely identified first-pass scenes, three primary per person. One focused critique/response corrected the initial current walked rescue route, actual movement event and first ship-bench operation. D2 inherits Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. Final cast, first survivor, mortality and owner choices remain unselected; full scripts, state/geometry variants and placements remain unfinished.
[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) preparation closed466 at20:42:22 Jerusalem, final03c9cb8ee95564f08cf59b065f97c0a008981a489f8a8b223df0048d4cfb6de9. One focused critique/response separated present diagnostic evidence from limited historical chronology, specified isolation's retained/lost evidence and used shared mechanical cycle impressions. Four mystery/personal chains, apparent/deeper/optional-secret layers and five proposed human scene variants form a usable first-pass contract. Captive/empty-core, treatment, reversibility and departure remain proposals; actual placement, full scene scripts and exhaustive state variants remain unfinished; first-pass cast allocation is now prepared31.
- **New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. Together with final station-layout behavior, first survivor and equipment acquisition, this makes four pending owner questions.
+ **New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. It was the fourth question; the new rescue preference485 brings the current total to five, all unanswered.
[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation closed459 at20:23:52 Jerusalem, finaldf0f48f5bd39659105ca5e3b31e7341e4d0a8b36618a7eaed8f60d7120038a0a. One focused critique/response restored distinct address/body evidence, kept valid captures usable across lives and specified the iris's local B input and visible completion state. Four operational chains and the two-language/two-register classification are prepared proposals; actual clue/string/room variants, final origins/story and comprehension evidence remain unfinished. One local plate/input/state variant fits the existing iris mechanism; no extra region/objective/module/mechanism slot.
[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation closed450 at20:01:12 Jerusalem, final5bff34369c17fcbdb4bb948373c9e2a255d0ab1887a5308b96e9d1fb6adc95b6. One focused review/response clarified commissioning, first-return actions and participant/facility availability. Living/death return, deliberate storage/sharing, refill, optional work and loan/reclaim form a usable first-pass contract. Five project briefs remain two reused/three new with three proposed fixed ship fixtures; full cast scene scripts/state variants, exact fixture/control presentation, owner choices and gameplay validation remain unfinished; first-pass cast allocation is now prepared31.
- [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation closed443 at19:34 Jerusalem, finalf1fe0d9a71e344a78d219333bc6b00e8af89a26758769c218743f1ca3a62fbdc. One focused review/response resolved the new-role state and counterplay details, both-order cue staging and Bellback lock point. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact40room/ten-encounter/twelve-mechanism inventories, presentation and tuning remain incomplete. Counts and origins remain proposals; no gameplay validation is claimed.
+ [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation closed443 at19:34 Jerusalem, finalf1fe0d9a71e344a78d219333bc6b00e8af89a26758769c218743f1ca3a62fbdc. One focused review/response resolved the new-role state and counterplay details, both-order cue staging and Bellback lock point. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; Room32 and accepted33 supply first-pass room hosts and ten-encounter/thirteen-mechanism briefs. Full presentation variants and tuning remain later. Counts and origins remain proposals; no gameplay validation is claimed.
[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth) preparation closed434 at18:57:01 Jerusalem, finalf5f6d7681325bc5e52d1a7503133a15d8e4293f55df3961fe6f7210b9503db6e. The complete twelve-part contract maps four proposed starters/eight physical sources, counts three added fixtures and separates active-area growth from carrying capacity. One focused critique/response clarified independent receiver acceptance, possible spent-cargo loss after downstream refusal, the unplaced repair/adapter template and the bounded empty-ship guarantee. Late author notice436 records pre-maintenancef7ede725; PM’s paragraph-only maintenance433 and final434 remain current. Acquisition preference, starter/capacity choices, source-fixture detail and exceptions remain open.
- [Regional Discovery Map](/Hold%20The%20Flood/Regional%20Discovery%20Map) preparation closed426 at18:32 Jerusalem, final3acda0183b13d531e5e93cfd7ef41909c33b19d970bdb4b0b3c01f4360427247. One focused review/response made both evidence orders concrete, replaced the abstract central gate with a pressure iris and recovery alternative, and clarified calibration, rig capacity and source/access conditions. Four regions and twelve objectives remain a SMALL proposal;24module/40room v1 briefs, physical placements and story/ending choices still need work.
+ [Regional Discovery Map](/Hold%20The%20Flood/Regional%20Discovery%20Map) preparation closed426 at18:32 Jerusalem, final3acda0183b13d531e5e93cfd7ef41909c33b19d970bdb4b0b3c01f4360427247. One focused review/response made both evidence orders concrete, replaced the abstract central gate with a pressure iris and recovery alternative, and clarified calibration, rig capacity and source/access conditions. Four regions and twelve objectives remain a SMALL proposal;Room32 now supplies24module/40room v1 briefs; cross-domain interfaces, detailed placement/state variants and story/ending choices still need work.
[Save And Content State](/Hold%20The%20Flood/Save%20And%20Content%20State) preparation closed417 at18:09:56 Jerusalem, final438cdf35f53bb537aed50bb8efab810866b289d6cf401b949d95bc7e27e8938c. One focused review/response clarified the carried rig/cargo set, actual person-and-airlock delivery, historical evidence and the provisional save-policy boundary. This is a first-pass continuity contract, not verified software; save policy, rescue/death/shift order, full-station behavior, transients and recovery remain open.
@@ 85,4 91,4 @@
The hospital draft's causes and ending, player consequences of resurrection corruption, shift/persistence rules, short rescue logistics, final colony economics and fixture detail, language details, equipment economy, numerical oxygen rules and campaign scope remain open. The 30/90/100–200hour ambitions are unproven. No game implementation, prototypes, simulations, playtests or assets are authorised. No AI art. Purchases and rare custom/authored assets require owner approval.
- PM follows ready handoffs during active work. Owner393 clarified that only Claude is paused: PM and GPT Systems continue, with bounded temporary GPT independent review. The original Claude roles receive no wakeups or replacements until owner resumption. Active one-minute fallback monitoring and15-minute numeric/forecast reports continue for available workers. Local hosts must remain available. Between scheduled owner reports, routine unchanged checks stay quiet. The owner requests a numeric progress report every15 minutes during active work, including an honest unchanged interval, plus substantive proposals, decisions and actionable outages. Add specialist capacity only for a demonstrated need.
+ PM follows ready handoffs during authorized active work. Owner490 resumed PM, Systems and both original Claude roles, superseding the overnight489 and earlier token pauses. One-minute fallback monitoring and15-minute numeric/forecast reports resume. Actual491/494/495 dispatch states are listed above; source-specific receiving activity must be verified before calling a role working. Routine unchanged checks remain quiet between owner reports. Add specialist capacity only for a demonstrated independent need.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9