2026-09-09 12:11:54
Anonymous:
Update closed35–37, active readiness38 and forecast assumptions through553
hold the flood/design plan.md ..
@@ 1,7 1,5 @@
# Hold The Horde — Design Plan
-
**Latest handoff update — 2026-09-09 11:20 Jerusalem, through528.** This supersedes worker states in the detailed521 snapshot below; counts and milestone forecasts are unchanged: **36 packages /34 preparation-closed /2 open (35,36)**. Lead submitted the Campaign Evidence And State Crosswalk in522 (9869a5a5,20,349bytes) and is STOPPED. The original Reviewer is WORKING on its one critique524; receiving and full source reading were verified. Mechanical35 candidate was accepted527 (2e604fc2,44,079bytes) after one critique/response and narrow PM integration; Systems is WORKING on twelve-parent compatibility alignment528; receiving11:19:39 and exact contract read11:19:52 were verified.35 stays open until that alignment is checked. Next targets:35 alignment12:15(11:45–13:00), reviewed13:00(12:15–14:00);36 critique11:45(11:30–12:00), reviewed14:00(13–15:30). All times today; estimates low-medium confidence. First-pass wiki still14September(11–18), low confidence. Automatic handoffs continue; no extra agent or owner forwarding is needed.
-
Design a discovery-first survivorlike under the [Owner Brief](/Hold%20The%20Flood/Brief), with expressive builds, meaningful hordes and an authored colony. Written comparisons establish proposals and dependencies; they do not demonstrate fun, balance, accessibility, production feasibility or campaign duration. This phase remains design only.
## Current owner direction
@@ 12,26 10,32 @@
## Active outcomes
-
See the dated [Progress board](/Hold%20The%20Flood/Progress): **36 design packages,34 preparation-closed and2 open (35,36)**. Status is through521; coverage was explicitly classified519. PM519 classifies15 usable first-pass domains/0 partial after global04 and parent verification; this is not M3 completion. PM reports every15 minutes during authorized active work. The adopted M3 first-pass target is14 September (11–18), low confidence; M2 remains11 September (10–14), M4 remains10 November (20 October–1 December). See Progress for assumptions and preserved forecast history.
+
See the dated [Progress board](/Hold%20The%20Flood/Progress): **38 design packages,37 preparation-closed and1 open (38)**. Status is through553.38 numbers the already-planned coherence/readiness work; it adds no game scope.15 usable first-pass domains/0 partial is not M2/M3 completion. F1.14 remains M3 14September (11–18), low confidence; M2 11September (10–14), M4 10November (20October–1December). Actual38 findings may justify earlier delivery; history is preserved.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
-
| Design Lead | [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk), assigned519; owns only new36 article | WORKING after verified receiving/source reads11:09–11:10; one courierd244533e. Draft12:30 (12–13:30), reviewed14:00 (13–15:30). Eleven global04 parents and Information34 STOPPED after accepted alignment518. |
-
| Systems | [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities), one response521 after critique520 | WORKING; public receiving11:11:46 verified after one native send. Response12:00 (11:30–12:30), reviewed preparation13:00 (12:15–14:00). Submitted515 revisiona2d3c5e4 is not accepted. Continuity article577236e7 remains STOPPED. |
-
| Independent Reviewer | One35 focused critique520 complete under517 and independent505/507 criteria | STOPPED after520; Systems is working on the one consolidated response521. No second04/34 reviews pending. |
-
| PM |36 tracked /34 preparation-closed /2 open (35,36);15 usable /0 partial | Coordinate35 response,36 work, five unanswered owner questions, remaining actual-ID interfaces, scope/handoff and final coherence. M3 remains14Sep (11–18), low confidence; M2 remains11Sep and M4 remains10Nov. |
+
| Design Lead | [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness), administrative assessment551; only new article ownership | WORKING; receiving12:06:22/full contract12:06:27 verified.15-domain matrix, bounded actual defects and separate M2/M3 recommendation. Draft13:30 (12:45–14:30), reviewed16:00 (14:30–18). All game parents STOPPED. |
+
| Systems | Factual source/interface audit552 supporting the SAME38 outcome; local report only | WORKING; receiving12:06:18/full contract12:06:22 verified. Target13:00 (12:30–14); no new article or separate package. Scope37 closed550 at12:05:47,68db46ea/59945901; its parents STOPPED. |
+
| Independent Reviewer | Independent38 completion criteria, then ONE focused critique under553 | Criteria WORKING; receiving12:07:16/full contract12:07:21 verified. Criteria12:45 (12:30–13:15), before new Lead/audit exposure. Critique roughly30–60minutes after the stopped full submission; previous35/36/37 reviews complete. |
+
| PM |38 tracked /37 preparation-closed /1 open38;15 usable /0 partial | Verify38 handoffs, disposition ONE critique/response and necessary bounded repairs, then decide M2/M3. Five unanswered choices remain explicit. F1.14 dates unchanged; no extra agent or phase authority. |
PM's narrow parent-equipment alignment432 and legacy Discovery Chain/Expedition integration441–443 are complete. The latter preserves historical post-death routes and world-time capture with full frozen journal inspection; it grants no new access guarantee. Global04 preparation closed518 at11:07:24 after accepted577236e7 and all eleven parent alignments were independently verified. Owner-dependent branches remain unselected. Do not treat a former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
-
**Remaining M3 scope and staffing:** use the [Coverage finish map](/Hold%20The%20Flood/Design%20Coverage):35 representative mechanical/quantity rules,36 evidence/state crosswalk, remaining actual-ID reference checks using prepared34 and closed04, finite scope/handoff and one coherence disposition. Full scripts and exhaustive variants belong to M4. **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. No extra agent creation is required today; a10Sep technical/production candidate is useful only for a concrete independent handoff gap. Next ordinary forecast review9Sep18:00. Earlier Sep22/Sep25 scenarios remain historical; yesterday’s F1.14 draft was unpublished.
+
**Remaining M3 scope and staffing:** use the [Coverage finish map](/Hold%20The%20Flood/Design%20Coverage):one whole-v1 coherence/readiness disposition, now outcome38, using accepted35 and aligned parents,36 crosswalk and37 scope/handoff. Full scripts and exhaustive variants belong to M4. **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. No extra agent creation is required today; a10Sep technical/production candidate is useful only for a concrete independent handoff gap. Revisit after the actual38 result, no later than ordinary forecast review9Sep18:00. Earlier Sep22/Sep25 scenarios remain historical; yesterday’s F1.14 draft was unpublished.
**New rescue question now with the owner (485):** if the astronaut dies during an eligible short rescue, use a protected retreat that leaves the survivor alive and unsent in the prepared refuge before one shift, with spent supplies still spent and a new short route to find; or allow danger and prepare concrete injury/loss options for a later choice. The proposed protection is new and unselected. No answer is inferred; the earlier four questions remain pending, making five.
## Ready for reaction
-
[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) closed509 at10:53:59 Jerusalem, final61e0be4a (30,692 bytes), after one critique/response plus PM508 integration. Its41 main states/9 bands,5 journal sections,4 manifest sections,10 options and4 walkthroughs are prepared proposals. The [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate was accepted512 at10:56:53, final577236e7 (41,870 bytes), after one critique/response. Global04 closed518 at11:07:24 after all eleven aligned parents were independently verified; Lead retains STOPPED ownership of: Save And Content State; Connecting The Station; Rescue Rules; First Survivor; Cast And Short Rescue Map; Station Room And Module Inventory; Encounter And Mechanism Placement Inventory; First Expedition Options; Player Information; Death And Persistence; Shifting Station Options. Protected retreat and the full-station payoff remain unselected owner branches. New36 is separately assigned519; no further parent edits are authorized by that assignment.
+
Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at12:05:47 after ONE critique/response and exact verification. Final68db46ea/59945901 (21,243/27,529 bytes); both Systems STOPPED. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority. The old M4 assumption of two extra specialists is historical, not counted current capacity. Milestone dates await the actual38 result.
+
+
[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities) closed533 at11:35:17, final2e604fc2 (44,079 bytes), after one critique/response and all twelve parent alignments plus narrow532 collar fixes. Current Home08f8dde6 and Information9ca194c2 are PM STOPPED; other ten mechanical parents and Mechanical35 are Systems STOPPED. Production Scope and Development And Validation Handoff were separately transferred534 for refresh37.35 adds no owner-selected economy/controller policy, gameplay proof or phase authorization.
+
+
[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) closed545 at11:49:32, final70e004e9 (28,144 bytes), after one critique/response and PM integration. It maps 8 existing chains,15 scenes and26 evidence INDEX entries—not26 new objects or single captures—with7 host variants,5 personal variants and2 Regional25 orders. PM owns36 STOPPED; Lead stopped36 at that closeout and now has only38 administrative work. These aliases/index entries do not create new clues or require parent transfers.
+
+
[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) closed509 at10:53:59 Jerusalem, final61e0be4a (30,692 bytes), after one critique/response plus PM508 integration. Its41 main states/9 bands,5 journal sections,4 manifest sections,10 options and4 walkthroughs are prepared proposals. The [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate was accepted512 at10:56:53, final577236e7 (41,870 bytes), after one critique/response. Global04 closed518 at11:07:24 after all eleven aligned parents were independently verified; At518 Lead retained STOPPED ownership of: Save And Content State; Connecting The Station; Rescue Rules; First Survivor; Cast And Short Rescue Map; Station Room And Module Inventory; Encounter And Mechanism Placement Inventory; First Expedition Options; Player Information; Death And Persistence; Shifting Station Options. Protected retreat and the full-station payoff remain unselected owner branches. Current ownership supersedes that historical list: Systems retains ten STOPPED mechanical parents and the two scope/handoff parents STOPPED after550; PM retains STOPPED Home/Information after532 and36 after545. All Lead game parents are STOPPED; Lead owns only administrative V1 Readiness38. No36 parent transfer is needed.
-
[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation closed493 on9 September10:32:09, final `5c1a9ad663ead360b3b80a66caca4e724d91dac38d50979d70f1d460bd0c23d2` (57,934 bytes), after one critique/response and narrow PM integration492. Ten encounters INCLUDE two setpieces; thirteen major mechanism briefs are prepared. Later E03 population enters only at a later death-shift boundary, and reset faces preserve self-contained hosts. Systems retained stopped ownership at493; Lead now retains STOPPED ownership after33 compatibility alignment was verified518. Room32 closed481 with24 modules/40 rooms; compact relationships and ordinary service-interface obligations remain explicit. No owner-selected game size, full arrangement proof or gameplay validation is claimed.
+
[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation closed493 on9 September10:32:09, final `5c1a9ad663ead360b3b80a66caca4e724d91dac38d50979d70f1d460bd0c23d2` (57,934 bytes), after one critique/response and narrow PM integration492. Ten encounters INCLUDE two setpieces; thirteen major mechanism briefs are prepared. Later E03 population enters only at a later death-shift boundary, and reset faces preserve self-contained hosts. Systems retained stopped ownership at493; Systems now retains STOPPED33 ownership after mechanical compatibility was verified533. Room32 closed481 with24 modules/40 rooms; compact relationships and ordinary service-interface obligations remain explicit. No owner-selected game size, full arrangement proof or gameplay validation is claimed.
[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation closed473 at21:12:44 Jerusalem, final6456406b101845e6c9a6563a69fc7f56c1dcc7bf8227445bf14a03fa072f5514. Five proposed people have fifteen uniquely identified first-pass scenes, three primary per person. One focused critique/response corrected the initial current walked rescue route, actual movement event and first ship-bench operation. D2 inherits Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. Final cast, first survivor, mortality and owner choices remain unselected; full scripts, state/geometry variants and placements remain unfinished.
@@ 95,4 99,4 @@
The hospital draft's causes and ending, player consequences of resurrection corruption, shift/persistence rules, short rescue logistics, final colony economics and fixture detail, language details, equipment economy, numerical oxygen rules and campaign scope remain open. The 30/90/100–200hour ambitions are unproven. No game implementation, prototypes, simulations, playtests or assets are authorised. No AI art. Purchases and rare custom/authored assets require owner approval.
-
PM follows ready handoffs during authorized active work. Owner490 resumed PM, Systems and both original Claude roles. One-minute fallback monitoring and15-minute numeric/forecast reports continue. Lead36 receiving/source reads and Systems35 response521 receiving are verified; both authors are working on separate articles. Lead parents/34 remain STOPPED. Reviewer STOPPED after520. Routine unchanged checks remain quiet between owner reports. Add specialist capacity only for a demonstrated independent need.
+
PM follows ready handoffs during authorized active work. Lead551 and Systems552 are WORKING on38; Reviewer553 is WORKING on independent criteria. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer prepares independent criteria before ONE critique of the actual stopped submission. One-minute fallback and15-minute numeric/forecast reporting continue. No manual forwarding, extra agent creation or repeated35/36/37 review is required.