2026-09-10 11:12:36
Anonymous:
Record early combat draft submission without implying review acceptance
hold the flood/progress.md ..
@@ 18,8 18,8 @@
| Task | Responsible | Status and concrete result | Next estimate |
|---|---|---|---|
| 47 — Spectacular builds and expedition growth | Systems | Active: replace Build Rules and repair acquisition/controller rules, including multiple weapons, paused link editing and the selected reset | Draft target 12:05 |
-
| 48 — Ordinary hordes and encounter pressure | Design Lead | Working: replace Combat Rules and revise the roster and all ten encounter placements | Drafts 12:15–12:45 |
-
| 49 — One combined review | Reviewer | Criteria prepared; review follows both submitted drafts | Included in the 14:00 reviewed-batch target |
+
| 48 — Ordinary hordes and encounter pressure | Design Lead | Submitted at 11:07: Combat Rules, roster and all ten encounter placements; PM source checks underway | Combined review after the Systems draft |
+
| 49 — One combined review | Reviewer | Criteria prepared; combat draft received, awaiting Systems submission | Included in the 14:00 reviewed-batch target |
| Integration, source checks and owner updates | PM | Active; six existing articles assigned with separate writers | Alongside drafts and review |
| 38 — Full design readiness | PM | Reopened after owner feedback | First-pass wiki target 15 September |
| 39–40 — Earlier detailed samples | Systems / Design Lead | Parked and unaccepted | Reassess after correction |