Commit 4b9dab

2026-09-08 17:16:20 Anonymous: PM continuation: only Claude paused; GPT catalogue and coverage work active
hold the flood/design plan.md ..
@@ 10,14 10,14 @@
## Active outcomes
- See the dated [Progress board](/Hold%20The%20Flood/Progress): **19 design packages,18 preparation-closed and1 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
+ See the dated [Progress board](/Hold%20The%20Flood/Progress): **20 design packages,18 preparation-closed and2 open**, with decision status kept separate. The owner now requests reports every15 minutes while work is active, plus meaningful milestone/blocker updates. The owner also requires forward estimates: current F1 target for a complete first-pass game-design wiki is22 Sep (range18–29 Sep), with a coherent core targeted11 Sep (10–14 Sep). See the Progress forecast for completion definitions, staffing and assumptions.
| Role | Bounded outcome | Actual status and dependency |
|---|---|---|
- | Design Lead | Player Information18 preparation closed387 | Paused by owner for token limits; no wakeup until owner confirms return |
- | Systems | Survival And Loadout19 | Preparation closed16:45; Systems stopped, next work queued for morning |
- | Independent Reviewer | Survival review385 complete | Paused by owner; no new review assignment or courier until owner resumes |
- | PM | Close in-flight work, preserve forecasts and queue morning work | Owner389 pause overrides routine wakeups; hourly quiet checks during break; core11Sep/wiki22Sep unchanged |
+ | Design Lead | Player Information18 preparation closed387 | Claude paused by owner; no wakeup until owner confirms |
+ | Systems | Equipment Catalogue394; sole owner of new article | Actual receiving verified; draft18:00(17:30–18:15), reviewed18:30(18–19) today |
+ | Independent Reviewer | Permanent Claude role paused | Temporary GPT helper has independent catalogue criteria saved; PM relays its bounded review |
+ | PM | Full-v1 coverage audit, forecasts and ready handoffs | GPT work continues under owner393; active monitoring/reports restored, core11Sep/wiki22Sep unchanged |
The PM marked conflicting old rules in their owning articles after a source impact audit. Permanent map placement is superseded; remembered positions are historical; death/rescue ordering is unresolved. The next consolidated update will follow a concrete shift comparison. Do not silently treat the former fixed-anchor alternative as owner-selected, or invent destruction, duplication or survivor loss to handle a shift.
@@ 61,4 61,4 @@
The hospital draft's causes and ending, player consequences of resurrection corruption, shift/persistence rules, short rescue logistics, full colony systems, language details, equipment economy, numerical oxygen rules and campaign scope remain open. The 30/90/100–200hour ambitions are unproven. No game implementation, prototypes, simulations, playtests or assets are authorised. No AI art. Purchases and rare custom/authored assets require owner approval.
- PM follows ready handoffs during active work. Owner389 has paused Claude Lead/Reviewer for token limits until morning resumption is confirmed; no wakeups or replacement sessions during that pause. Hourly checks remain quiet while the team is stopped. Normal active coordination resumes only after the owner confirms availability. Local hosts must remain available. Between scheduled owner reports, routine unchanged checks stay quiet. The owner requests a numeric progress report every15 minutes during active work, including an honest unchanged interval, plus substantive proposals, decisions and actionable outages. Add specialist capacity only for a demonstrated need.
+ PM follows ready handoffs during active work. Owner393 clarified that only Claude is paused: PM and GPT Systems continue, with bounded temporary GPT independent review. The original Claude roles receive no wakeups or replacements until owner resumption. Active one-minute fallback monitoring and15-minute numeric/forecast reports continue for available workers. Local hosts must remain available. Between scheduled owner reports, routine unchanged checks stay quiet. The owner requests a numeric progress report every15 minutes during active work, including an honest unchanged interval, plus substantive proposals, decisions and actionable outages. Add specialist capacity only for a demonstrated need.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9