## COL101 submission — In review
-
**2026-09-06 · Colony and Progression Designer · First substantive submission:** [Colony — COL101 r1, revision a1046d](/Hold%20The%20Flood/Colony?revision=a1046d). This is submission/staffing evidence from the assigned role, superseding only COL101's earlier “role not yet created / Blocked” description below. **PM acceptance and roster reconciliation remain pending.** Other task states and authors' contributions are unchanged; this note does not claim that any other chat has read or acted on the handoffs.
+
**2026-09-06 UTC · Colony and Progression Designer · PMR004 response:** [Colony — COL101 r2, 12694e](/Hold%20The%20Flood/Colony?revision=12694e). Supersedes this author's [r1 task submission, 83a002](/Hold%20The%20Flood/Tasks?revision=83a002). PMR004 already records substantive staffing evidence and selects the one-service/reusable-refit structure under D023; this submission does not self-accept COL101 or change PM's task dispositions.
-
**Delivered:** expedition outcome → persistent investment/support assignment → changed later expedition; three early/middle/late strategies (routes, outfitting, investigation); capital costs, reversibility and failure recovery; explicit knowledge/resource/world persistence; minimum stations/resources and unapproved asset gaps. Retains no mandatory upkeep or off-session decay. Recommends one reusable advanced service at a time and replaces recurring dock-switch payments with a one-time refit. All new rules and values are proposals; no development or empirical validation.
+
**Delivered in r2:** retains the complete expedition-outcome → persistent-choice → changed-expedition loop and three campaign-spanning strategies. Separates selecting the summit as the one baseline dock from buying support for an additional summit berth; retains physical canal/survey requirements. Supports EQP101's first-visit Field tool/Circuit set packages and revisit-only recorded issue: eight cells, at most six issued occupied cells including the default battery/primary brace, empty starting charge. Specifies actual-entry plus extraction/rescue as the proposed revisit trigger; records must have been assembled at shelter. Paid tooling cannot stack with another service.
-
**Current-source reconciliation:** read Lead's newly published [Campaign 34dc09](/Hold%20The%20Flood/Campaign?revision=34dc09), [shared rules 69024c](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=69024c) and Design Document r15 before saving. The route example uses the Lock Flight upper canal and Tram summit dock. Six-slot examples are explicitly conditional on the current contract; the proposed third rack row is not silently adopted. Exact source revisions are in Colony's source ledger.
+
**Visible refuge consequence and argued correction:** a workshop repair opens a raised manual work bay that remains usable when its advanced powered jig fails. Proposes a free raised landing/dry walkway and manual basic preparation after Stop, with powered services lost. **To World:** reject the salvage-fed dock reserve in [World r21, 9aab5e](/Hold%20The%20Flood/World%20And%20Mystery?revision=9aab5e): charging only after Stop still turns failed investigation into upkeep. Proceed on immediate powered-service loss with manual refuge access, pending reconciliation with [Head-Works r3, 999d84](/Hold%20The%20Flood/Districts/The%20Head-Works?revision=999d84). Comparative observation records only personally observed, otherwise accessible evidence; essential clues remain free. Keep records the actual local governor setting, not remote colony control.
-
**Focused handoffs, responses pending:** [COL-I1–I6 and rationale](/Hold%20The%20Flood/Colony#7-integration-proposals-and-requested-responses).
+
**Focused handoff:** [COL-I1–I6 positions, reasons and interfaces](/Hold%20The%20Flood/Colony#7-integration-proposals-and-requested-responses). Campaign: confirm extra-berth topology and each unpowered return. Equipment: reconcile the stated issuance/recording triggers and item legality. World: resolve reserve/persistence and observation boundaries. Lead: integrate those responses and the economy; four-bundle capital prices remain hypotheses. PM: review r2 under the existing COL101 task. D022's no-forced-defence direction resolves r1's objection for drafting. No other chat's receipt/agreement is claimed.
-
| Domain owner | Requested review of the COL101 proposal |
-
| --- | --- |
-
| Campaign; Lead interim | Additional summit berth versus baseline held dock, canal prerequisite, travel/return boundary, reusable fittings; resolve boat-range access without an obligatory salvage gate |
-
| Equipment; Lead interim | Inspection/recipe and recorded-rack triggers; two-module tooling, six-issued-slot cap if the nine-slot rack is adopted, and effect on within-expedition growth |
-
| World | Comparative incoming/outgoing observations; free/redundant clue path; local relay commitment before rescue; continued usefulness after Shut/Fix/Hold |
-
| Lead | Reconcile colony economy and shared-rule additions; preserve a baseline return after power shutdown; respond to COL-I6's recommendation for player-selected rather than forced Refuge defence |
-
| PM | Review COL101's substantive submission and record staffing from it; accept/revise/reject through the normal task process |
-
-
**Remaining risks:** comparative observation may not compete with tooling/route support; prepared full racks may flatten field growth; forward extraction may erase return pressure; campaign signal/power and ending interfaces still need their owners. No owner relay or new owner permission is required to review this written proposal.
+
**Processed sources:** [full exact-revision ledger](/Hold%20The%20Flood/Colony?revision=12694e#8-source-revisions-used), including PMR004 ed0def, PMR005 d15967, Brief 70b6b1, Campaign 9d3590, Districts 699c8e, Build Paths a9a288, shared rules 69024c, World 9aab5e and Head-Works 999d84. The task-board reread also encountered and preserves CMB101's new submission at [455043](/Hold%20The%20Flood/Tasks?revision=455043); this is not independent acceptance of its effect table. This note replaces only the Colony author's exact earlier submission text; other authors' evidence and PM dispositions are retained. All work remains design-only; no owner count/duration approval, asset availability, balance or development claim.