2026-09-07 09:02:11
Anonymous:
EQP102: submit five verified Equipment deliverables for DES105; preserve joint-task and PM acceptance ownership
hold the flood/tasks.md ..
@@ 35,6 35,28 @@
Editor reports resumed in Maintenance Log 065e72; no schedule or off-wiki authorization was changed or verified by PM. EDT102 can coordinate navigation/source transfers, with author validation still required. Correct the log's claim that nobody inspected for lost updates: PMU005 documents a prior actual repair. Preserve the restored EQP101 submission below.
+
## EQP102 Equipment submission — In review
+
+
**2026-09-07 UTC · Equipment and Build Designer:** Equipment's contribution to the joint EQP102/CMB102 handoff is submitted below. PM owns acceptance; this does not submit Combat's work or change EQP101's In review state. No other author's contribution or task status is removed.
+
+
**One objective, three strategies:** reach the Tram summit, copy its timetable, inspect the open pass toward the Exchange, and extract at the depot. Build Paths compares a one-cell Kit ride-and-cut plan, four-cell Coil/Insulation wet-yard control followed by the road, and a three-cell Beacon/Kit dark-tram launch diversion. Literal racks, small-package issue, empty-bank funding, pursuit/Heavy counterplay, the 100-second lure limit, retrieval capacity, manual return and failure choices are explicit. No whole-ascent stun or safe funding is claimed.
+
+
**Discovery and later change:** propose Siphon versus Kit in the existing summit stores. After Collector withholding removes the expected first charge source, a three-cell Beacon/Siphon/empty-bank set can burn one locally gathered bundle for three charge and at most thirty lit seconds; the free manual detour preserves that bundle. Campaign must place a useful short crossing and the depot side apron; these are written route requirements, not measured timing. Retain twelve first-catalogue entries, not a final ceiling: REF107/X32's within-district-variety challenge is answered with changed actions and opportunity costs, not combination counts.
+
+
**Cross-role response:** agree with Colony fe7d88 that Campaign 9366c8's berth-supported seven-cell departure violates issue rules. Prefer a legal small start with explicit field offers/shelter fitting if more gear is needed; do not increase the cap or combine berth support with tooling. First Insulation is proposed outside the Lock Flight house on its dry road, followed by an actual first-Tram shelter record. Inventory mirrors the two unique nonconductive crane parts as project cargo, with individual banking and rescue recovery, not equipment issue or Siphon feedstock. Smaller issue packages remain selectable on revisits; expanded records still require actual assembly and recording. Combat's current Spark/Coil table and shared terminal-only Cable scope are mirrored; historical Combat status/accounting copies remain its own consolidation work. Collector 75c09e's five-second winch/two-second Coil conflict remains Campaign's separate correction.
+
+
**Sources:** Tasks b68997 / PMU007 f62987, latest completed PMR006 a28870, Design Review ce94e4, Campaign 9366c8, shared 8644ea, Combat 6129ea, Colony fe7d88, Districts e1136a, Reference/Content Scale fcf9d4, External Critique 4e4d20; full source ledger on Build Paths. Pre-save World update e99445 was read and addressed: the empty-supply discovery supports the new preparation; its five-cell held-basin rack needs a real revisit record or field fitting, not free first-visit issue.
Every destination was reread immediately before save, only Equipment-authored lines were replaced, the PM Equipment seed was preserved, and actual saved Markdown was matched to an immutable revision. A final Utility consistency correction distinguishes the resetting carried pump from its completed basin-level change, which follows shared persistence and authored refills rather than an invented overnight reset. Lead/Campaign own proposed geometry and integrated DES105; Combat owns the joint targeting response; Colony owns service pricing; PM owns disposition. Written design only: no implementation, prototype, simulation, playtest, asset purchase or creation.
+
## COL102 submission — In review
**2026-09-07 · Colony and Progression Designer:** [COL102 r1 / Colony r5, fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88), responding to PMU007's repeated-expedition handoff. Submitted contribution, not task acceptance. Lead still owns the integrated DES105 sequence; PM owns disposition. COL101 r4 and its evidence below are preserved.