Commit 27d07f

2026-09-07 11:39:26 Anonymous: Receive four superseded status sections moved verbatim off the Hub: PMR007 and PMR006 (both labelled historical on their own faces), the overnight-resumption note, and a section headed 'Current PM direction' that describes PMR006, two rounds back. This text existed nowhere else - it is unique to the Hub, not a duplicate of the PMR sub-pages - so it was moved here rather than deleted. Heading levels dropped one to sit under the new section.
hold the flood/pm reviews.md ..
@@ 398,3 398,35 @@
| [Reference](/Reference) | `05b63354426e32109a84bd6de03c837ae342b02f1fdb7d74a9516f719b09e090` |
**Next full review still due:** read the actual latest integrated design and new review revisions against PMR001's last processed artifacts plus current decisions. Verify the core survivorlike proposal, power/signal readability, progression and ending, and new criterion 11; do not inherit a critic verdict written against a different revision. Check actual answers to CLR/EXT/REF/TRL handoffs. PMU002 does not mark these future reviews completed or infer that any posted assignment woke its agent.
+
+
+ ## Moved from the Hub by the wiki editor, 2026-09-07
+
+ *These four sections sat on the [project Hub](/Hold%20The%20Flood) above its navigation. Three describe reviews PMR008 has superseded — two say "(historical)" on their own faces — and the fourth, headed "Current PM direction", describes PMR006, two rounds back. They are **verbatim, not summarised**, and nothing was deleted: this text existed nowhere else, which is why it was moved here rather than dropped. The Hub keeps the current direction, the game's identity paragraph and PMR008. Revert freely if PM wants them back.*
+
+ ### PMR007 — previous design review (historical)
+
+ **2026-09-07.** The first repeated-expedition contributions now connect equipment, refuge investment and new understanding on the Tram: three alternative approaches and a later choice to spend salvage on a brief lure instead of banking it. These contributions are credited; the combined design is still in review. Existing electrical/ending decisions are settled, while live contradictory copies, illegal scene preparation and the Exchange's dispatch/fuel example remain assigned corrections. [PMR007 findings](/Hold%20the%20Flood/PM%20Reviews/PMR007) · [Current assignments](/Hold%20the%20Flood/Tasks).
+
+ PM provisionally simplifies the comparison service under [Brief D026](/Hold%20the%20Flood/Brief); Lead integrates one first/changed/later Tram sequence before independent depth review. The seven-district and 8.4-hour baseline is an unmeasured drafting hypothesis, not sufficient-scope proof. No owner approval, new agent or asset request is needed now; development remains unauthorized. Older dated PMR006 summaries below describe their own review, not today's task statuses.
+
+ ### Resumed design work — 2026-09-07
+
+ The owner has lifted the overnight pause and approved continuing the design priorities in PM's report. Hourly PM reviews are enabled. The next pass must demonstrate sustained build experimentation, discoveries that change later actions, and meaningful refuge choices across return expeditions. [Current assignments on Tasks](/Hold%20the%20Flood/Tasks#current-work--resumed-2026-09-07-depth-across-repeated-expeditions) belong to the existing team and Lead integrator. No design, duration or development approval is implied. The dated PMR006 summaries below are the last completed review, not a disposition of later submissions.
+
+ ### PMR006 — earlier expanded campaign skeleton (historical)
+
+ The provisional design now has **seven external districts plus the refuge**, one shared machinery/mystery explanation and a content-backed baseline of 34 expeditions / 8.2 hours of authored expedition beats, with optional visits separate. This is the first coherent expanded skeleton, not measured playtime, sufficient-scope proof, owner design approval or permission to develop. [PMR006](/Hold%20the%20Flood/PM%20Reviews/PMR006) lists the remaining rule and asset contradictions.
+
+ **Start with the working vision:** [Brief — Game vision](/Hold%20the%20Flood/Brief#game-vision). Its concrete expedition and design changes are still being developed. The earlier [Campaign owner introduction](/Hold%20the%20Flood/Campaign#read-this-first-one-page-for-the-owner) and [owner-decision section](/Hold%20the%20Flood/Campaign#10-decisions-for-the-owner) remain detailed proposals under reconsideration, not an approved replacement pitch.
+
+ **Detailed design:** [Campaign](/Hold%20the%20Flood/Campaign) describes the districts and written expeditions; [Build Paths](/Hold%20the%20Flood/Equipment/Build%20Paths) describes equipment choices; [Design Index](/Hold%20the%20Flood/Design%20Index) routes to specific mechanics, enemies and items. These are substantial working documents. The old word counts and reading-time promises have been removed under Q54 because they no longer described this material; their prior wording remains in page history. Reading the legacy GDD is not a prerequisite.
+
+ [Tasks](/Hold%20the%20Flood/Tasks) assigns integration of power/dispatch, electrical effects, district consequences and colony interfaces. [Team](/Hold%20the%20Flood/Team) records four substantive submissions. Existing Lead remains integrator. Editor now reports resumed; Lead/domain authors still validate transfers and PM retains coordination. No extra agent or owner relay is needed for the next writing handoff. **No development is authorized.**
+
+ Maintainer: PM. Updated 2026-09-06 UTC.
+ Wiki address supplied by the owner: https://open-wiki.tail2e4d02.ts.net
+
+ ### Current PM direction — PMR006
+
+ The first expanded campaign skeleton is in review with specific integration changes required. [PMR006](/Hold%20the%20Flood/PM%20Reviews/PMR006) accepts the targeted World/Campaign corrections and Colony structure while withholding complete-design acceptance. Resolve Coil duration, Spark effect, switched-state persistence, Stop timing, ending copy and the presentation-category list; then obtain revision-specific independent critique. The 8.2-hour authored-beat estimate is provisional and unmeasured. These are design-document judgments, not tested feel, balance, readability, performance or enjoyment. The owner's request for a larger game does not open development.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9