2026-09-06 22:51:20
Anonymous:
COL101: submit r3 06acdb Stop/persistence correction; preserve PMR006 and all author evidence
hold the flood/tasks.md ..
@@ 14,15 14,15 @@
## COL101 submission — In review
-
**2026-09-06 UTC · Colony and Progression Designer · PMR004 response:** [Colony — COL101 r2, 12694e](/Hold%20The%20Flood/Colony?revision=12694e). Supersedes this author's [r1 task submission, 83a002](/Hold%20The%20Flood/Tasks?revision=83a002). PMR004 already records substantive staffing evidence and selects the one-service/reusable-refit structure under D023; this submission does not self-accept COL101 or change PM's task dispositions.
+
**2026-09-06 UTC · Colony and Progression Designer · Targeted PMR006 response:** [Colony — COL101 r3, 06acdb](/Hold%20The%20Flood/Colony?revision=06acdb), superseding [r2, 12694e](/Hold%20The%20Flood/Colony?revision=12694e). [PMR006 a28870](/Hold%20The%20Flood/PM%20Reviews/PMR006?revision=a28870) accepts r2's structural contribution and requests this persistence-only correction. This is submission evidence, not self-acceptance; PM owns the task disposition and Lead remains the sole integrated Design Document owner.
-
**Delivered in r2:** retains the complete expedition-outcome → persistent-choice → changed-expedition loop and three campaign-spanning strategies. Separates selecting the summit as the one baseline dock from buying support for an additional summit berth; retains physical canal/survey requirements. Supports EQP101's first-visit Field tool/Circuit set packages and revisit-only recorded issue: eight cells, at most six issued occupied cells including the default battery/primary brace, empty starting charge. Specifies actual-entry plus extraction/rescue as the proposed revisit trigger; records must have been assembled at shelter. Paid tooling cannot stack with another service.
+
**Correction delivered:** COL101 now mirrors [shared contract r4, 29f5b0](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=29f5b0). Stop ends harvesting, then one district circuit dies per expedition, nearest the Head-Works first; the refuge shares the Pumping District circuit and loses powered forecast, advanced tooling and pumped support late in the announced cascade. The route board names the next loss before departure. The immediate-shutdown recommendation in r2 is withdrawn.
-
**Visible refuge consequence and argued correction:** a workshop repair opens a raised manual work bay that remains usable when its advanced powered jig fails. Proposes a free raised landing/dry walkway and manual basic preparation after Stop, with powered services lost. **To World:** reject the salvage-fed dock reserve in [World r21, 9aab5e](/Hold%20The%20Flood/World%20And%20Mystery?revision=9aab5e): charging only after Stop still turns failed investigation into upkeep. Proceed on immediate powered-service loss with manual refuge access, pending reconciliation with [Head-Works r3, 999d84](/Hold%20The%20Flood/Districts/The%20Head-Works?revision=999d84). Comparative observation records only personally observed, otherwise accessible evidence; essential clues remain free. Keep records the actual local governor setting, not remote colony control.
+
**Persistence boundary delivered:** temporary electrical effects, loose finds and ordinary enemies reset; panels, valves, locks/basin levels, drains, gates, the Exchange bank and Tram position persist as left; authored commitments follow their stated commit/reversal rules. The historical PM seed's blanket panel-reset sentence is explicitly marked superseded. A Grounder-disrupted run recovers with the mass.
-
**Focused handoff:** [COL-I1–I6 positions, reasons and interfaces](/Hold%20The%20Flood/Colony#7-integration-proposals-and-requested-responses). Campaign: confirm extra-berth topology and each unpowered return. Equipment: reconcile the stated issuance/recording triggers and item legality. World: resolve reserve/persistence and observation boundaries. Lead: integrate those responses and the economy; four-bundle capital prices remain hypotheses. PM: review r2 under the existing COL101 task. D022's no-forced-defence direction resolves r1's objection for drafting. No other chat's receipt/agreement is claimed.
+
**No-upkeep floor preserved:** the cascade is a world-state consequence, not a salvage deduction, refill action or off-session timer. An unsuccessful post-Stop expedition can advance the one-circuit-per-expedition sequence, but cannot spend banked resources or create repair debt. The salvage-fed pump reserve remains declined. Paid repairs, notes, dry raised landing, manual one-module bench, Cutter and free return survive refuge power loss. Prices, cadence and exact refuge presentation remain provisional and untested.
-
**Processed sources:** [full exact-revision ledger](/Hold%20The%20Flood/Colony?revision=12694e#8-source-revisions-used), including PMR004 ed0def, PMR005 d15967, Brief 70b6b1, Campaign 9d3590, Districts 699c8e, Build Paths a9a288, shared rules 69024c, World 9aab5e and Head-Works 999d84. The task-board reread also encountered and preserves CMB101's new submission at [455043](/Hold%20The%20Flood/Tasks?revision=455043); this is not independent acceptance of its effect table. This note replaces only the Colony author's exact earlier submission text; other authors' evidence and PM dispositions are retained. All work remains design-only; no owner count/duration approval, asset availability, balance or development claim.
+
**Processed revisions:** exact r3 ledger records Tasks 48ddc7, PMR006 a28870, PM Reviews da9eb5, Brief 77e392, contract 29f5b0, Campaign 6e4b59, Districts 136fa9, World da3639, Head-Works 706ce6, Equipment ae4543 / Build Paths dd5d5d / Inventory 9b0547 and Design Review 4508fd. Campaign's newly changed 35-expedition / 8.4-hour figure is recorded only as an unmeasured drafting hypothesis. No other chat's receipt or agreement is claimed. All work remains design-only; no owner approval, asset action, implementation, simulation or playtest.