Commit 13c20b

2026-09-06 23:32:15 Anonymous: COL101: submit r4 support-assembly acquisition reconciliation; preserve PM and author evidence
hold the flood/tasks.md ..
@@ 14,15 14,15 @@
## COL101 submission — In review
- **2026-09-06 UTC · Colony and Progression Designer · Targeted PMR006 response:** [Colony — COL101 r3, 06acdb](/Hold%20The%20Flood/Colony?revision=06acdb), superseding [r2, 12694e](/Hold%20The%20Flood/Colony?revision=12694e). [PMR006 a28870](/Hold%20The%20Flood/PM%20Reviews/PMR006?revision=a28870) accepts r2's structural contribution and requests this persistence-only correction. This is submission evidence, not self-acceptance; PM owns the task disposition and Lead remains the sole integrated Design Document owner.
+ **2026-09-06 UTC · Colony and Progression Designer · Campaign acquisition reconciliation:** [Colony — COL101 r4, 527f2b](/Hold%20The%20Flood/Colony?revision=527f2b), superseding [r3, 06acdb](/Hold%20The%20Flood/Colony?revision=06acdb). PMR006's structural acceptance and targeted correction remain the latest PM disposition; no new PM review is inferred. This is submission evidence, not self-acceptance. PM owns task disposition and Lead remains the sole integrated Design Document owner.
- **Correction delivered:** COL101 now mirrors [shared contract r4, 29f5b0](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=29f5b0). Stop ends harvesting, then one district circuit dies per expedition, nearest the Head-Works first; the refuge shares the Pumping District circuit and loses powered forecast, advanced tooling and pumped support late in the announced cascade. The route board names the next loss before departure. The immediate-shutdown recommendation in r2 is withdrawn.
+ **Conflict resolved for review:** Campaign r4 says Lock Flight crane parts pay for the colony's reusable support assembly, while COL101 r3 said the refuge provided it. R4 adopts Campaign's one-time discovery milestone: inspect and extract two fixed project parts, each occupying one rack cell; each banks separately, and both commission the assembly with no salvage fee or timer. They are project cargo, not equippable items, modules or recipes. The visible consequence is an incomplete then completed workshop frame; the cost is one or two cargo cells on the recovery expedition.
- **Persistence boundary delivered:** temporary electrical effects, loose finds and ordinary enemies reset; panels, valves, locks/basin levels, drains, gates, the Exchange bank and Tram position persist as left; authored commitments follow their stated commit/reversal rules. The historical PM seed's blanket panel-reset sentence is explicitly marked superseded. A Grounder-disrupted run recovers with the mass.
+ **Failure and access floor:** rescue loses only a part currently carried; an unbanked part returns to its fixed source and a banked part remains. The free starter, local machinery, essential evidence, baseline docks, free departure/return and three base repairs do not require the assembly. Campaign owns guaranteed reachable placement and reappearance; if its route cannot be completed with free starter/local machinery, the milestone moves rather than becoming an Equipment gate. Once commissioned, the assembly remains the one reusable advanced-service capacity and cannot be lost, duplicated or consumed.
- **No-upkeep floor preserved:** the cascade is a world-state consequence, not a salvage deduction, refill action or off-session timer. An unsuccessful post-Stop expedition can advance the one-circuit-per-expedition sequence, but cannot spend banked resources or create repair debt. The salvage-fed pump reserve remains declined. Paid repairs, notes, dry raised landing, manual one-module bench, Cutter and free return survive refuge power loss. Prices, cadence and exact refuge presentation remain provisional and untested.
+ **Boundaries and alternatives:** this adds no upkeep, off-session decay, repeatable salvage gate or price inflation. The credible free-at-start alternative exposes service choice sooner but leaves the capacity abstract; the preferred fixed, separately banked recovery makes district exploration visibly change the refuge while protecting failed investigation. Equipment owns cargo presentation, Campaign owns route/topology, World owns evidence/story effects, and Lead/PM own integration and acceptance. Identifiable crane parts and the incomplete-to-complete frame are unapproved presentation gaps; no availability, purchase or asset creation is claimed.
- **Processed revisions:** exact r3 ledger records Tasks 48ddc7, PMR006 a28870, PM Reviews da9eb5, Brief 77e392, contract 29f5b0, Campaign 6e4b59, Districts 136fa9, World da3639, Head-Works 706ce6, Equipment ae4543 / Build Paths dd5d5d / Inventory 9b0547 and Design Review 4508fd. Campaign's newly changed 35-expedition / 8.4-hour figure is recorded only as an unmeasured drafting hypothesis. No other chat's receipt or agreement is claimed. All work remains design-only; no owner approval, asset action, implementation, simulation or playtest.
+ **Processed revisions:** Colony r4 records Tasks ca40f9, PM Reviews da9eb5 / PMR006 a28870, Design Review 4508fd, Brief 77e392, Campaign 7daf34, shared contract 08d5e8, Equipment dc3aa2 / Build Paths 7b7bf2 / Inventory 9b0547, World d108c1, Districts 136fa9 and Head-Works 706ce6. No other chat's receipt or agreement is claimed. All work remains design-only; no owner approval, implementation, simulation or playtest.
## CMB101 — PMR006 response, In review
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9