2026-09-07 13:07:42
Anonymous:
COL102 r4: same-state later Tram comparison recommends simultaneous purchased services; shared exclusivity remains pending Visionary/PM; close issue correction, retire own old ledgers, relocate Troll notice intact; chat through 20
hold the flood/colony.md ..
@@ 1,16 1,12 @@
# Hold the Flood — Colony and Persistent Progression
-
## TRL-AS1 — focused challenge to the Colony designer
-
-
**2026-09-07 · The Troll · Awaiting author response; existing recommendation unchanged.** Your §COL102 defense of one active assembly is substantive. [The contest and strongest rival](/Disagreement%20Register/Support%20Assembly) ask whether its continuing exclusivity earns its cost **after both fittings are purchased**. Compare the best legal plans for the same later Tram objective, knowledge and world state with exclusive support versus simultaneous purchased tooling and one extra eligible berth. Which worthwhile expedition decision disappears, and why does preserving it outweigh the experiment the rival permits? Lead supplies the shared scene; PM owns disposition. Please reply publicly here or on the contest page with a reasoned defense, amendment or precise unknown. Agreement requires the changed premise, actual revision, accepted disadvantage and surviving original argument. This notice does not claim you have read it.
-
The refuge is the place your expeditions change. You bring home salvage and what you learned, then choose what that makes possible next time: a repaired workshop prepares a known tool, a receiver compares signals you personally observed, and dock fittings let you choose where to return. Repairing one delays another. None charges rent, decays while you are away, or makes a failed investigation create a bill.
-
Later, two recovered crane parts become one reusable support assembly. Before departure, assign it either to advanced workshop preparation or to an extra extraction berth. Better preparation means committing to one return point; the extra berth means relying on a smaller starting loadout and what you find in the field. The assignment can change freely at home, while purchased repairs and banked parts stay yours.
+
Later, two recovered crane parts become one reusable support assembly. The current shared draft assigns it either to advanced workshop preparation or to an extra extraction berth. Purchased repairs and banked parts stay yours, and assignment changes freely at home. **Colony now proposes allowing both purchased fittings to work together:** the same-state comparison below finds no useful lost dilemma on the retained later Tram objective. This is a proposed change, not yet a replacement for the shared rule; the detailed baseline below still uses exclusivity.
Home should show that progress: the workshop shutter stays open, the recovered frame is installed, and the manual bench remains usable when the city's power eventually fails. That is the proposed physical refuge, not a claim of tested emotional attachment. The detailed choices and failure rules follow below.
-
**COL102 r3 / Colony r7 · 2026-09-07 UTC · Colony and Progression Designer · Focused response submitted.** PMR008 accepts r2's targeted corrections. This pass supplies the requested current plain-language opening, answers Lead's refuge tension using existing facilities, and flags the remaining berth-start issue. It adds no facility, currency or upkeep rule.
+
Maintained by the Colony and Progression Designer. Current shared rules are distinguished from the proposed service-policy change below. Written illustrations are not evidence of tested behavior, balance or attachment.
Supersedes [COL102 r2 / Colony r6, 59ad65](/Hold%20The%20Flood/Colony?revision=59ad65), [COL102 r1 / Colony r5, fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88), [COL101 r4, 527f2b](/Hold%20The%20Flood/Colony?revision=527f2b) and earlier revisions linked in §8. Lead is the sole integrated Design Document owner under D014. The attributed PM seed at the foot is preserved verbatim.
@@ 22,7 18,7 @@
**Current boundary:** [the shared contract r7](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4) adopts one held dock plus one supported shelter, tooling versus berth support, D026's base-receiver comparison, the gradual Stop cascade, no salvage-fed pump reserve, the dry/manual refuge baseline and ordinary switched-state persistence. Exact repair prices and final refuge presentation remain Colony proposals. Equipment owns issue packages; Campaign owns the current integrated Tram example. No example here depends on an unresolved electrical effect.
-
The credible alternative is to make every repair always active. That gives uncomplicated accumulation, but eventually removes the colony decision from departure. One assigned service keeps a repaired colony useful without requiring recurring payments or progressively more currencies. Its risk is domination by one service; the three strategies below expose the choices for written review, not evidence of equal balance.
+
The credible alternative lets the purchased tooling and one eligible additional berth operate together. It removes a recurring departure restriction, but not investment order, rack space, empty departure batteries, field acquisition or physical route requirements. The comparison below now recommends that alternative; until reconciled by Visionary/Lead and disposed by PM, the tables describe the existing exclusive baseline rather than silently implementing the proposal.
## Integration against the Campaign submission that arrived during COL101
@@ 76,7 72,7 @@
## COL102 — Two development approaches across Tram returns
-
**COL102 r2 · 2026-09-07 · Accepted contribution; D026 correction submitted.** [PMR007](/Hold%20The%20Flood/PM%20Reviews/PMR007?revision=6fb181) accepts the two investment trajectories within their stated scope, conditional on Lead's route/acquisition integration. [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) now integrates that common case. The sequence remains a written design example rather than validated duration, balance or play behavior, and its scene-specific revisions remain Lead's responsibility.
+
These trajectories demonstrate investment order under the current exclusive-service draft. They are not the later comparison after both purchases, which follows below. [Campaign](/Hold%20The%20Flood/Campaign) owns the integrated scene and its consequences; this sequence remains a written illustration, not validated duration, balance or play behavior.
### The same place, three different reasons to go
@@ 102,17 98,32 @@
### Is one active assembly enough?
-
**Retain one for this draft.** A can take a smaller departure rack to keep two possible exits; B can prepare protection plus a powered response while accepting one exit. A's later workshop purchase also shows that base repairs combine with a service, so the choice is not “route player has no equipment forever.” Switching a baseline dock gives B a credible route alternative without granting two hard stops. The consequence of the assembly assignment remains legible in the expedition.
+
**Proposed change: allow both purchased services after commissioning.** The reason is not that more options are always better. My earlier defense established that exclusivity removes a combined departure, but did not establish that the removed combination harms this game's exploration. The two investment paths compare different purchase histories; they cannot establish the value of continuing exclusivity once both purchases are complete. [The Troll's same-state challenge](/Disagreement%20Register/Support%20Assembly?revision=66b254) identifies that distinction correctly.
+
+
#### Same-state comparison: set the lit tram above the refuge road and bank the bundle
+
+
Use [Campaign 93f482, later return](/Hold%20The%20Flood/Campaign?revision=93f482): Gates selected, tram at the depot behind its Heavy, first supply withheld, the next arrival at 8:00, dry stairs and manual depot crank unchanged. The player already knows the cadence and has surveyed the summit; the upper canal is joined. Both base repairs, both advanced fittings and the two-part assembly are owned. The same known recipes and valid recorded arrangements are available under both policies, including the small Beacon/Siphon/battery circuit. Start at the depot under both policies; this comparison does not relocate arrival or create a remote entry. The summit still offers its existing bundle and Siphon-or-Kit choice. Stop has not occurred.
+
+
**Objective and comparison criterion:** leave the tram at the summit with its lamp lit, bank the existing bundle, and return without an unnecessary encounter or wait. This is the scene's retained objective, not a new experiment imposed to justify equipment. “Best” below means a least-demanding plan supported by these written rules, not a proven fastest or safest route in a game.
+
+
| Policy | Best supported plan for that objective | Cost, retreat and unused opportunity |
+
| --- | --- | --- |
+
| Current exclusive services | Assign the assembly to the eligible summit berth; retain depot baseline. Ordinary issue of a known Kit and empty default battery is sufficient, and either may be declined. Clear the same Heavy with the free Cutter before the withheld arrival, switch Rail, ride the lit tram, leave it above and take the bundle. Extract at the supported summit instead of retracing the stairs. | No advanced issued circuit; no charge is required to achieve the objective. The same Heavy clearance remains. The Kit occupies one cargo cell if carried. If the ride is abandoned, keep the depot return; if summit support proves unavailable, the authored dry stairs and manual crank remain the fallback. Do not invent an exact summit extraction time; Campaign specifies that interaction. |
+
| Purchased tooling and berth together | Enable the same summit berth and choose the same small issue and route. Tooling is available, not a duty to fill six cells. Leave the lamp lit and bank the same bundle at the same berth. | The same clearance, cargo and retreat conditions apply. Advanced preparation adds no required action to this objective. A fuller rack consumes cargo space and is therefore not automatically the better departure. |
+
+
**What does not distinguish them:** neither needs the Siphon, portable lure or a wet-yard harvest for the stated objective. Both can retain the already-authored depot return, with its 5:30 extraction, instead of using the summit berth. Neither must stay for the second tick. The existing supported-berth rule makes the summit a stop, not a way into an unsurveyed district. Its interaction timing is not supplied here; uncertainty about it applies equally to both policies and cannot demonstrate a benefit of exclusivity.
-
The credible alternative is two simultaneous services: berth plus tooling would support experimentation with less retreat risk. I reject that change at this stage because it removes precisely the competing choice the Tram currently supplies; it also lets a nominal preparation limit be bypassed by always pairing its solution with the extra exit. This is a written design argument, not demonstrated balance. The risk of one service is real: if every useful objective sits beside one freely selected baseline dock, forward support becomes redundant. Campaign should price an actual lower/upper decision or omit the extra berth there, not add danger or a new toll solely to force its purchase.
+
**What the rival really permits:** the same prepared Beacon + Siphon + empty battery circuit can now depart with summit support, rather than forcing the choice between issuing both modules and retaining two exits. That spends three rack cells and still needs field charge. It supplies an experiment with a fallback, not an extra payoff established for this objective. The exclusive plan can also inspect/take the existing summit Siphon and fit there after starting with Beacon + battery, so that combination is not a newly exclusive discovery. No second fitting is a licence for more than six issued cells, an unknown recipe, a charged departure or a second additional berth.
+
+
**Judgment and accepted disadvantage:** no worthwhile objective-level dilemma disappears in this comparison; the strongest supported plan is the same. The real loss is the general commitment to a single exit when requesting fuller preparation on other expeditions. I now prefer letting late refuge investment remove that restriction: learning what to attempt, carrying the equipment and finding its fuel should bear the experiment's cost, rather than withdrawal of an already-earned fallback. That is a creative preference with a risk—some later retreat decisions could become less tense—not evidence that combined services are balanced everywhere. Early investment order, the separately banked crane parts and the powered/manual refuge distinction still stand from the original argument. Do not add a hazard, toll, waiting period or higher purchase price to make this comparison come out differently.
+
+
**Precise proposed rule delta and dependencies:** after the existing commissioning and both one-time purchases, tooling and one eligible additional berth may operate simultaneously, subject to their existing power and access conditions. Remove the exclusive assignment and revocation of tooling issue when berth support is chosen; retain berth selection, all issue/record limits, two-part recovery, free return and the Stop cascade. No new station, person, resource or asset is needed by this rule change. Visionary judges the tradeoff; Lead owns reconciliation of Campaign §5 and [shared rules §6](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4); Equipment owns its issue/pattern mirrors at [Build Paths f6f8ef](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=f6f8ef); PM owns provisional disposition. World evidence and story commitments do not change. Until that decision, D023/D026 exclusivity remains the working rule. I would retain it if a retained same-state objective shows a valuable commitment that both services erase and that we explicitly prefer to the lost experimentation; no new demonstration task is being manufactured here.
**D026 adopts the fallback:** the separate comparative-reader fitting is removed from the live recommendation. The repaired base receiver places two personally observed records side by side, while the assembly competes only between tooling and berth support. This preserves the field attention cost and free essential evidence without pretending comparison can rival a second exit or a dependable build. It never reveals an unobserved signal or sells the Exchange's bank state, which the free prelaunch board already shows. The rejected three-service version remains at [r5](/Hold%20The%20Flood/Colony?revision=fe7d88).
### Focused handoff and remaining correction
-
**Resolved r1 finding:** [Campaign r5 §3.2](/Hold%20The%20Flood/Campaign?revision=9366c8) had started its second Tram visit with the summit berth supported and seven equipment cells, illegally combining the two assembly services. Colony proposed ordinary issue plus explicit field offers, or a smaller rack. [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) now removes that over-issued start; the older paragraph is retained only as review provenance.
-
-
Lead has integrated these trajectories into [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) and removed the over-issued berth start. [REV105 r3](/Hold%20The%20Flood/Design%20Review?revision=265a09) now credits Lead's earned-ease revision and closes those earlier Tram findings; this does not establish the berth-supported starting issue as legal. The remaining Colony issue is specified in the vision response below. Equipment's r4 smaller-package clarification remains the issue boundary. World r26 mirrors D026 and owns the observation chain. Campaign owns actual return paths and cuts any test trip that adds no new player question. Minimum resources/facilities/assets remain §2/§6; no new people, buildings, currency or asset creation is proposed.
+
The starting-issue corrections and recording-shelter dependency are closed at [Campaign 93f482](/Hold%20The%20Flood/Campaign?revision=93f482) and [Build Paths f6f8ef](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=f6f8ef). Smaller packages remain selectable on revisits. The live cross-domain decision is the service policy above; the existing refuge-consequence work remains with Visionary and Colony. Earlier exchange and issue correspondence remains in [history c56634](/Hold%20The%20Flood/Colony?revision=c56634), not a request to repeat delivered corrections.
## Vision response — make preparation an action at home
@@ 120,7 131,7 @@
**Retain earned ease.** Campaign's quick later return now treats understanding as a payoff and leaves extended observation optional. Colony supports that: neither salvage prices nor refuge investment require waiting for another surge or repeating a solved investigation. PMR008 accepted our earlier option to omit unnecessary verification trips. The complete integrated scene still belongs to Lead and its reviewers.
-
**Remaining preparation correction — Lead/Equipment:** Campaign 0cafb9's changed-return alternative assigns the assembly to the berth but starts with Beacon + Battery + Kit. Beacon and Kit are two modules; ordinary workshop issue permits one known module plus the default battery. The three occupied cells do not make that departure legal. Smallest correction: issue the known Beacon and empty Battery, leave Kit behind, and price the route with no issued heal. If Kit is necessary, Campaign must name its field offer and acquisition cost before use; do not grant tooling alongside berth support. This does not reopen the resolved seven-cell example or the quay-dock record.
+
**Current preparation boundary:** [Campaign 93f482](/Hold%20The%20Flood/Campaign?revision=93f482) corrects the berth-supported start to Beacon + empty Battery. Under the current exclusive rule, ordinary issue permits one known module, not two; cell count alone never establishes eligibility. This correction is closed. The proposed simultaneous-service policy above is a separate design choice, not a retroactive excuse for the earlier illegal start.
## 4. Three connected examples for the domain owners
@@ 216,44 227,20 @@
## 8. Source revisions used
-
**COL102 r3 / Colony r7, 2026-09-07:** compared against own [r2 59ad65](/Hold%20The%20Flood/Colony?revision=59ad65) and [task handoff d518c6](/Hold%20The%20Flood/Tasks?revision=d518c6). Read index/log and actual sources: [Tasks 1c38ca](/Hold%20The%20Flood/Tasks?revision=1c38ca), [PM Reviews 27d07f](/Hold%20The%20Flood/Pm%20Reviews?revision=27d07f), [PMR008 37fd94](/Hold%20The%20Flood/Pm%20Reviews/Pmr008?revision=37fd94), [Review 265a09](/Hold%20The%20Flood/Design%20Review?revision=265a09), [Brief 0fff74](/Hold%20The%20Flood/Brief?revision=0fff74), [Campaign 0cafb9](/Hold%20The%20Flood/Campaign?revision=0cafb9), [Build Paths 6d6d1d](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6d6d1d), [Equipment ba5942](/Hold%20The%20Flood/Equipment?revision=ba5942), [World 7b8ad1](/Hold%20The%20Flood/World%20And%20Mystery?revision=7b8ad1), [contract 5322f4](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4), [Team 890a96](/Hold%20The%20Flood/Team?revision=890a96) and [Conventions 86a8db](/Wiki%20Conventions?revision=86a8db). Hub, Expansion Brief and Design Index were also reread. PMR008 is the acceptance source for r2; r3 is submitted for review. Earlier checkpoints below are history. No new owner approval or claimed play evidence.
+
**Compact review checkpoint, 2026-09-07 — COL102 r4.** Compared with [Colony c56634](/Hold%20The%20Flood/Colony?revision=c56634), which contains the prior ledgers and superseded correspondence. Read and handled every returned project message: **4, 16, 17, 18, 20**; the subsequent `since=20` read returned no messages. Last processed incoming message ID: **20**. PM's refuge-consequence assignment remains open; this bounded response answers the service comparison, not that separate creative treatment. World notation correction remains World-owned. No chat delivery to an agent is inferred.
-
**COL102 r2 / Colony r6 processed sources, 2026-09-07:** compared live Markdown with accepted [Colony r5 fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88) and its [task submission b68997](/Hold%20The%20Flood/Tasks?revision=b68997). Read index and log, then current [Tasks 575001](/Hold%20The%20Flood/Tasks?revision=575001), [PM Reviews e8a263](/Hold%20The%20Flood/Pm%20Reviews?revision=e8a263), [PMR007 6fb181](/Hold%20The%20Flood/Pm%20Reviews/Pmr007?revision=6fb181), [Design Review REV105 r1 35cccf](/Hold%20The%20Flood/Design%20Review?revision=35cccf), [Brief 0cba02](/Hold%20The%20Flood/Brief?revision=0cba02), [Campaign DES105 r1 ee4202](/Hold%20The%20Flood/Campaign?revision=ee4202), [shared contract r7 5322f4](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4), [Equipment r5 0efeb4](/Hold%20The%20Flood/Equipment?revision=0efeb4), [Build Paths r4 6bc3f7](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6bc3f7), [World r26 744b21](/Hold%20The%20Flood/World%20And%20Mystery?revision=744b21) and [Districts r9 e9c413](/Hold%20The%20Flood/Districts?revision=e9c413). Hub, Team, Expansion Brief and Design Index were reread; no Colony rule was inferred from their status copy. Wiki Conventions was reread before this revision. PMR007 accepts COL101's targeted corrections and COL102 r1's contribution; r2 applies the assigned D026 mirror. REV105 confirms colony investment changes capability but identifies Campaign-owned depth and scene defects, not a new Colony acceptance condition.
+
Decision sources: [PMR009 262856](/Hold%20The%20Flood/PM%20Reviews/PMR009?revision=262856), [PM Reviews e86295, PMR010](/Hold%20The%20Flood/PM%20Reviews?revision=e86295), [Tasks 4940b3](/Hold%20The%20Flood/Tasks?revision=4940b3), [Brief 6d869e](/Hold%20The%20Flood/Brief?revision=6d869e), [Campaign 93f482](/Hold%20The%20Flood/Campaign?revision=93f482), [Support Assembly 66b254](/Disagreement%20Register/Support%20Assembly?revision=66b254), [Review 615c4d](/Hold%20The%20Flood/Design%20Review?revision=615c4d), [contract 5322f4](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4), [Equipment 122d38](/Hold%20The%20Flood/Equipment?revision=122d38), [Build Paths f6f8ef](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=f6f8ef). Relevant World 43bcfe and legacy Design Document 125528 sections read; no fresh whole-page approval. Index/log discovered current pages; Hub 5f2c85, Team 0bff49, Expansion Brief 8e517e, Design Index 8edf4e, Chat Rooms 441178 and Wiki Conventions ed65ab supplied workflow/scope. Earlier detailed ledgers remain in the linked immutable Colony history. This records source processing, not proven gameplay or acceptance of the proposed service change.
-
**Earlier source ledgers below remain provenance; this paragraph is r2's processed checkpoint.**
-
-
**COL102 r1 / Colony r5 processed sources, 2026-09-07:** compared actual current Markdown with Colony r4 [527f2b](/Hold%20The%20Flood/Colony?revision=527f2b) and its task submission [13c20b](/Hold%20The%20Flood/Tasks?revision=13c20b). Read index and log, then the current [Tasks 6526ed](/Hold%20The%20Flood/Tasks?revision=6526ed), [PM Reviews f62987](/Hold%20The%20Flood/Pm%20Reviews?revision=f62987) (PMU007 assignment; PMR006 remains the completed review), [Design Review ce94e4](/Hold%20The%20Flood/Design%20Review?revision=ce94e4), [Hub 693f1b](/Hold%20The%20Flood?revision=693f1b), [Campaign 9366c8](/Hold%20The%20Flood/Campaign?revision=9366c8), [shared contract 8644ea](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=8644ea), [Districts e1136a](/Hold%20The%20Flood/Districts?revision=e1136a), [World 351f4c](/Hold%20The%20Flood/World%20And%20Mystery?revision=351f4c), [Equipment dc3aa2](/Hold%20The%20Flood/Equipment?revision=dc3aa2), [Build Paths 7b7bf2](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=7b7bf2), and [Wiki Conventions 72bb0f](/Wiki%20Conventions?revision=72bb0f). Brief 77e392, Team 3e5ce6, Expansion Brief 8e517e and Design Index 8edf4e were reread and unchanged from the preceding intake; their live navigation is below. World’s acceptance of COL-I3/I4 is domain agreement; the critic’s page-level closure is not PM acceptance. No DES105 combined return sequence was on Campaign at the cited revision, so COL102 offers the Tram case for integration.
+
**Deliberately superseded:** r1's conditional six-cell examples, discussion of purchasing a third rack row and still-pending first staffing acknowledgment; r2's immediate refuge shutdown; r3's assembly-provided-with-the-refuge sentence; r4's extraction condition on the Lock Flight canal; r5's separate comparative-reader fitting and three-way assembly competition; and the historical PM seed's blanket statement that panel/field state resets. D023, D026, PMR007, shared contract r7 and Campaign DES105 r1 replace those assumptions. The one-time prices remain hypotheses; the old recurring dock-switch payment survives only in the preserved PM seed. Full earlier rationale remains at the linked revisions, not as a second live rule set. In the retained seed below, read “field state and panel state reset” as historical only; §5's four-way persistence boundary is current.
-
**Earlier source ledger retained as provenance; the paragraph above is this submission’s processed checkpoint.**
+
<details>
+
<summary>Original attributed contest notice; current comparison is above</summary>
-
Processed on 2026-09-06 UTC against r3 [06acdb](/Hold%20The%20Flood/Colony?revision=06acdb) and its task submission [20c044](/Hold%20The%20Flood/Tasks?revision=20c044). No new PM review supersedes PMR006; this focused response reconciles the assembly source that Lead continues to state after that review. Exact current sources: Tasks [ca40f9](/Hold%20The%20Flood/Tasks?revision=ca40f9), PM Reviews [da9eb5](/Hold%20The%20Flood/PM%20Reviews?revision=da9eb5), Design Review r5 [4508fd](/Hold%20The%20Flood/Design%20Review?revision=4508fd), Brief [77e392](/Hold%20The%20Flood/Brief?revision=77e392), Campaign r4 [7daf34](/Hold%20The%20Flood/Campaign?revision=7daf34), shared contract r5 [08d5e8](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=08d5e8), Equipment r3 [dc3aa2](/Hold%20The%20Flood/Equipment?revision=dc3aa2), Build Paths r3 [7b7bf2](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=7b7bf2), Inventory r2 [9b0547](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=9b0547), World r23 [d108c1](/Hold%20The%20Flood/World%20And%20Mystery?revision=d108c1), Districts r5 [136fa9](/Hold%20The%20Flood/Districts?revision=136fa9) and Head-Works r4 [706ce6](/Hold%20The%20Flood/Districts/The%20Head-Works?revision=706ce6). The 35-expedition/8.4-hour Campaign figure remains an unmeasured drafting hypothesis, not an owner-approved duration.
+
## TRL-AS1 — focused challenge to the Colony designer
-
| Read source | Verified revision | Scope used |
-
| --- | --- | --- |
-
| [Hold The Flood](/Hold%20The%20Flood) | [34ca6d](/Hold%20The%20Flood?revision=34ca6d) | Current hub direction and role/navigation updates |
-
| [Hold The Flood/Brief](/Hold%20The%20Flood/Brief) | [70b6b1](/Hold%20The%20Flood/Brief?revision=70b6b1) | D014 and D022–D024; governing design constraints |
-
| [Hold The Flood/Tasks](/Hold%20The%20Flood/Tasks) | [469c70](/Hold%20The%20Flood/Tasks?revision=469c70) | Current COL101 handoff, submission preservation and PMR005 supplement |
| [Hold The Flood/Pm Reviews/Pmr004](/Hold%20The%20Flood/Pm%20Reviews/Pmr004) | [ed0def](/Hold%20The%20Flood/Pm%20Reviews/Pmr004?revision=ed0def) | Full integration review; Colony section and selected drafting rules |
-
| [Hold The Flood/Pm Reviews/Pmr005](/Hold%20The%20Flood/Pm%20Reviews/Pmr005) | [d15967](/Hold%20The%20Flood/Pm%20Reviews/Pmr005?revision=d15967) | Focused combat review; no new Colony acceptance or electrical-effect closure |
-
| [Hold The Flood/Design Review](/Hold%20The%20Flood/Design%20Review) | [80a882](/Hold%20The%20Flood/Design%20Review?revision=80a882) | REV104 campaign-interface critique; unchanged from r1 |
-
| [Hold The Flood/Team](/Hold%20The%20Flood/Team) | [3e5ce6](/Hold%20The%20Flood/Team?revision=3e5ce6) | Staffing evidence and division of ownership |
-
| [Hold The Flood/Expansion Brief](/Hold%20The%20Flood/Expansion%20Brief) | [8e517e](/Hold%20The%20Flood/Expansion%20Brief?revision=8e517e) | Current scope/quality constraints and integration direction |
-
| [Hold The Flood/Design Index](/Hold%20The%20Flood/Design%20Index) | [be4c43](/Hold%20The%20Flood/Design%20Index?revision=be4c43) | Actual pages, ownership and current migration status |
-
| [Hold The Flood/Campaign](/Hold%20The%20Flood/Campaign) | [9d3590](/Hold%20The%20Flood/Campaign?revision=9d3590) | Baseline docks, L2/summit topology, colony and persistent campaign effects |
-
| [Hold The Flood/Districts](/Hold%20The%20Flood/Districts) | [699c8e](/Hold%20The%20Flood/Districts?revision=699c8e) | CAM101 r3 travel/access/refuge positions and changed duration accounting; no duration endorsement |
-
| [Hold The Flood/Design Document](/Hold%20The%20Flood/Design%20Document) | [5f9fbb](/Hold%20The%20Flood/Design%20Document?revision=5f9fbb) | Legacy §§3–6/10–11 and scope-superseded header; unchanged r15 |
-
| [Hold The Flood/Mechanics/Power And Attraction](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction) | [69024c](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=69024c) | Shared one-dock, expedition/power/persistence boundary; D023 migration still required |
-
| [Hold The Flood/Equipment](/Hold%20The%20Flood/Equipment) | [a44990](/Hold%20The%20Flood/Equipment?revision=a44990) | Catalogue/acquisition ownership and domain constraints |
-
| [Hold The Flood/Equipment/Build Paths](/Hold%20The%20Flood/Equipment/Build%20Paths) | [a9a288](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=a9a288) | COL-I2 response, first-visit packages and recorded-rack examples |
-
| [Hold The Flood/Mechanics/Inventory And Charge](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge) | [73eb77](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=73eb77) | Eight-cell inventory proposal, item/issue boundaries |
-
| [Hold The Flood/World And Mystery](/Hold%20The%20Flood/World%20And%20Mystery) | [9aab5e](/Hold%20The%20Flood/World%20And%20Mystery?revision=9aab5e) | r21 D024 six states, reserve proposal, essential evidence and historical forecasts |
-
| [Hold The Flood/Districts/The Head-Works](/Hold%20The%20Flood/Districts/The%20Head-Works) | [999d84](/Hold%20The%20Flood/Districts/The%20Head-Works?revision=999d84) | r3 Stop/Keep/Leave, immediate power loss and unpowered return |
-
| [Hold The Flood/Districts/The Collector](/Hold%20The%20Flood/Districts/The%20Collector) | [29ece6](/Hold%20The%20Flood/Districts/The%20Collector?revision=29ece6) | r3 local charge use, buffer and water consequence interfaces |
| [Hold The Flood/Colony](/Hold%20The%20Flood/Colony) | [a1046d](/Hold%20The%20Flood/Colony?revision=a1046d) | Own r1 baseline, full source and author-preservation proof |
+
**2026-09-07 · The Troll · Awaiting author response; existing recommendation unchanged.** Your §COL102 defense of one active assembly is substantive. [The contest and strongest rival](/Disagreement%20Register/Support%20Assembly) ask whether its continuing exclusivity earns its cost **after both fittings are purchased**. Compare the best legal plans for the same later Tram objective, knowledge and world state with exclusive support versus simultaneous purchased tooling and one extra eligible berth. Which worthwhile expedition decision disappears, and why does preserving it outweigh the experiment the rival permits? Lead supplies the shared scene; PM owns disposition. Please reply publicly here or on the contest page with a reasoned defense, amendment or precise unknown. Agreement requires the changed premise, actual revision, accepted disadvantage and surviving original argument. This notice does not claim you have read it.
-
**Deliberately superseded:** r1's conditional six-cell examples, discussion of purchasing a third rack row and still-pending first staffing acknowledgment; r2's immediate refuge shutdown; r3's assembly-provided-with-the-refuge sentence; r4's extraction condition on the Lock Flight canal; r5's separate comparative-reader fitting and three-way assembly competition; and the historical PM seed's blanket statement that panel/field state resets. D023, D026, PMR007, shared contract r7 and Campaign DES105 r1 replace those assumptions. The one-time prices remain hypotheses; the old recurring dock-switch payment survives only in the preserved PM seed. Full earlier rationale remains at the linked revisions, not as a second live rule set. In the retained seed below, read “field state and panel state reset” as historical only; §5's four-way persistence boundary is current.
+
</details>
## PM seed — retained source material from before COL101